1 / 14

14 WING DE-ICING SITUATION FEB 2008

14 WING DE-ICING SITUATION FEB 2008. Capt Jamie Wells 14 Wing AFSO. De-icing Situation. Background De-icing Issues Refractometer Testing Procedure Product delivery Summary. Background.

oria
Download Presentation

14 WING DE-ICING SITUATION FEB 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 14 WING DE-ICING SITUATION FEB 2008 Capt Jamie Wells 14 Wing AFSO

  2. De-icing Situation Background De-icing Issues Refractometer Testing Procedure Product delivery Summary

  3. Background June 2005 the Airworthiness Review Board (ARB) directed Icing Operations Standing Committee (IOSC) formation. IOSC purpose is to articulate gaps in the icing program, Anti-ice, operating procedures. Transport Canada to do an Audit of the Wings (gap analysis) 14 Wing was First = good timing!!!

  4. De-icing Issues De-icing Product Mixing Tank Trucks Testing Procedures

  5. De-icing Product NSN 6850 01 508 8562 AMS-1424 TYPE 1 Incorrect labels on product

  6. De-icing Issues • De-icing Concentrate same NSN • 6850 01 508 8562 • 14 AMS 1424 TYPE 1 Return

  7. De-icing Mix Tank Concentrate mixing tank

  8. Mixing Tank 10,000 Lt Return

  9. Trucks As of 26 Feb 2008 - LMD-2000 - TM-1800 TM-1800 35/65 % MIX = NOT SO GOOD - Confirmed Mr Chaput LMD-2000 60/40 % mix = GOOD - Confirmed Mr Chaput Return

  10. Testing Procedure • When to use a Brix Refractometer . . . • No testing procedure post fluid mixture • Corrective measures: MAP, Written Procedures, UCR for mis-labelled products… Wg IOSC Greenwood Stood up • Recommend following procedures as outlined by Dow Chemical representative – Jacque… • C-82 (AFSO Bible)

  11. Product Delivery • Feb 08 SOA company (via PWGSC) was advised that ZX was charged for 73 barrels of concentrate, and received 73 barrels 60/40 mix (remember same stock number). To be replaced!! • SOA/PWGSC stated to be received NLT 30 May 08 • Actual receipt 30 Sep 2008 • Delta = 7 mths vs. normal max 2 week delivery

  12. Summary • Short term plans are in place, 14 Wing IOSC recently stood up to outline the CFB Greenwood future icing strategy. • All wings should be very cognisant of your de- icing procedures, ensure they are consistent with the processes in the C-82. • Be advised, an auditor will soon be coming to see YOU!!

  13. Questions?

  14. Brix Refractometer • PA203X - Palm Abbe Digital Refractometer • 5 Scales - PG Brix, Refractive Index (Kilfrost), Type 1 PG Celsius, Type 1 EG Celsius, DIEGME. • automatic Calibration www.misco.com (Cleveland , OHIO) Return

More Related