MONITORING ON TUNNEL CONSTRUCTION IN CZECH REPUPLIC

MONITORING ON TUNNEL CONSTRUCTION IN CZECH REPUPLIC. Monitoring. 1. DESIGN monitoring dimensions and instrumentation 2. MONITORING OFFICE data operating (archiving, sharing) measurement interpretation - results 3. MONITORING PANNEL monitoring conclusions ( 1 per week min. )

oriel
Download Presentation

MONITORING ON TUNNEL CONSTRUCTION IN CZECH REPUPLIC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MONITORING ON TUNNELCONSTRUCTION IN CZECH REPUPLIC

  2. Monitoring • 1. DESIGN • monitoringdimensions and instrumentation • 2. MONITORING OFFICE • data operating (archiving, sharing) • measurement interpretation - results • 3. MONITORINGPANNEL • monitoring conclusions (1 per week min.) • design and technology back analyses • 4. SPECIAL MODE • building under passing • public relation and cooperation with building's users

  3. HIGHWAY TUNNELS • Valík (D5 - Plzeň) • Panenská (D8 – Krušné Hory) • Libouchec (D8 – Krušné Hory) • Klimkovice (D47 – Ostrava) • RAILWAY TUNNELS • Krasíkov I a II (3. Transit corridor) • Malá Huba, Hněvkovský I, II (3. Transit corridor) • The New Junction (Prague) • Březno (Chomutov) 3. METRO • Line IV.C • PILOT TUNNELS • Prague’s highway ring • Brno’s road inner ring

  4. Tunnel Valík • Basic data: • tunnel length LTT= PTT= 330 m- cross section 125 m2 • 154,25 m2 emergency pits • - cut and cover LTT 50 m • PTT 60 m • SG – Geotechnika provides: • geotechnical supervision • monitoring office • monitoring instrumentation • - extensometerers • - leveling on surface • - portal deformation • tensmeters (prim. lining) • - tensometers (final. lining) - pressure cells- convergence

  5. Tunnel Valík

  6. Tunnel Panenská • Basic data : • tunnel length LTT= PTT= 2000 m- cross section 85 m2 125 m2 emergency pits • SG – Geotechnika provides: • geotechnical supervision • monitoring office • monitoring instrumentation • - extensometerers • - leveling on surface • - portal deformation • tens meters (prim. lining) • - pressure cells- convergence • - seismic and acoustic • measurement • hydrogeology • basic data on buildings • 3D scanner Cyrax

  7. Tunnel Panenská

  8. Tunnel Panenská

  9. Tunnel Klimkovice Basic data:- tunnel length LTT= PTT= 860 m- cross section 154,25 m2- cut and coverOstrava portal 50m Brno portal 170 m Join venture - Monitoring Tunnel Klimkovice: SG-Geotechnika a.s. GeoTest Brno a.s. Inset, s r.o. SG – Geotechnika provides:- geotechnical supervision - monitoring office - monitoring instrumentation - extensometers - convergence

  10. Tunnel Klimkovice

  11. Tunnel Klimkovice

  12. Tunnels Krasíkov I &II • Basic data: • - tunnel length1020 + 120 m- cross section95 – 120 m2 • SG-Geotechnika provides: • client technical supervision • geotechnical supervision • monitoring office • monitoring instrumentation • - extensometers • - leveling on surface • - portal deformation • - convergence • - basic data on buildings • - 3D scanner Cyrax

  13. Tunnels Krasíkov I &II

  14. Tunnels Krasíkov I &II

  15. Tunnels Krasíkov I &II

  16. Tunnels Malá huba, Hněvkovský I, II • Basic data: • - tunnel length380 + 120 + 420 m- cross section95 - 120m2 • SG-Geotechnika provides: • client technical supervision • geotechnical supervision • monitoring office • monitoring instrumentation • - extensometers • - leveling on surface • - portal deformation • - convergence • - basic data on buildings • - 3D scanner Cyrax

  17. Tunnels Malá huba, Hněvkovský I, II

  18. Metro IV. C (Ládví – Letňany) • Basic data: • - tunnel length : SO 09 – double track tunnel - 970 m • SO 13 – double track tunnel - 1335 m • - 2 x single track tunnel - 65 m • - cross section: 62 m2 - 97 m2 • Join venture: SG-Geotechnika a.s. • Inset, s r.o. • SG-Geotechnika provides : • - geotechnical supervision • monitoring office • monitoring instrumentation • - extensometers • - inclinometers • - building inclination (tilt meter) • - building cracks measurement • - convergence • - geology • - hydrogeology

  19. Metro IV. C

  20. Fartak tunnels, Republic of Yemen

  21. Fartak tunnels, Republic of Yemen • Basic data: • nr.of tunnels: 4 (T1,T2,T3,T4) • tunnels length: 1535 + 1015 + 250 + 320 m- cross section95-115 m2 • excavation method NRTM • Client: Kuwait Arab Fund • Builder: General Directorate of Roads, Republic of Yemen • Contractor: YERTAS, Turkey • Consultant: RENARDET s.a., • Italy - Yemen

  22. Fartak tunnels

  23. Fartak tunnels

  24. Fartak tunnels

  25. Fartak tunnels