90 likes | 173 Views
Using NEMAIS for IPE. Lean IPE Event 30 June 2005. NEMAIS Process 213. Uses the term “IDPE” for IPE Establishes NEMAIS as the database of record for RMC IPE Treats IPE in an FMA just like installed equipment in a ship Indicates that RMCs are responsible for accuracy of master data
E N D
Using NEMAIS for IPE Lean IPE Event 30 June 2005
NEMAIS Process 213 • Uses the term “IDPE” for IPE • Establishes NEMAIS as the database of record for RMC IPE • Treats IPE in an FMA just like installed equipment in a ship • Indicates that RMCs are responsible for accuracy of master data • Refers to Create Equipment (IE01) and Create Functional Location (IL01) transactions Enclosure (4)
NEMAIS Process 213 • Requires action by NEMAIS CDM to enter or change IPE data • Who is your NEMAIS CDM? (Newspaper?) • Incorporates logistics assistance • Initial load includes: • RMC UIC • Equipment description • Serial number • Location Enclosure (4)
Proposed RMC IPE Elements • Load the equipment data in the System (NEMAIS 213) • Create an annual IPE project (NEMAIS 110) • Create an IPE Support Team (NEMAIS 510) • Obtain IPE PMS requirements (Newspaper?) • Create a master schedule of maintenance (Newspaper?) • Create & Complete MWOs for items on the schedule (NEMAIS 230 & 700) • Provide annual budget input (NEMAIS 310) • Maintenance Costs • Replacement Costs • Complete the annual IPE project (NEMAIS 830) OP32 Non Labor Overhead Enclosure (4)
SAP Capabilities – not in scope • Maintenance Plans (PMS Scheduling) • Work Center Capacity (Facilities) • Impact of OOC equipment on capacity • Production Resource Tools • Designation of B&B machines • Planner schedules tool use on MWO • Permits for certain operations
Some Questions • Who should enter/maintain config data? • Has this been done? • Where is the cutoff point for IPE relevance? • Who creates a work candidate for IPE PMS or repair? • Should some IPE be designated PRTs? • What should we do with regard to slide 6? • What about non NEMAIS sites? • What about including RMC UIC in MFOM?
Notes • What should be done with existing excess IPE? Clear/share before DRMO? • How can we address IPE at non NEMAIS locations?