PIXEL Detector Integration mechanical requirements

PIXEL Detector Integration mechanical requirements. H. Wieman Christie Integration meeting 16-May-2008. topics. Introduction – parameters and requirements cooling system space power heat load to wide angle hall. Pixel detector function. Topological D meson reconstruction

osman
Download Presentation

PIXEL Detector Integration mechanical requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIXEL Detector Integration mechanical requirements H. Wieman Christie Integration meeting 16-May-2008

  2. topics • Introduction – parameters and requirements • cooling system • space • power • heat load to wide angle hall

  3. Pixel detector function • Topological D meson reconstruction • Requires high precision vertex pointing • Critical parameters: • very thin, low X/X0 • very close to the interaction point

  4. Pixel geometry End view 8 cm radius 20 cm 2.5 cm radius Inner layer Outer layer  coverage +-1 One of two half cylinders total 40 ladders

  5. Some pixel features and specifications critical and difficult (ALICE Pixels 0.9%)

  6. Pixel air cooling system Air flow: 400 SCFM Total pressure drop: 22 inches water Temperature: 75 deg F/34 deg C or maybe -10 deg C Wide angle hall ISC external duct 6 in diameter X 50 ft Internal duct 2 in diameter X 5 ft chiller Internal duct 2 in diameter X 5 ft pump external duct 6 in diameter X 50 ft

  7. Pixel heat load break down

  8. Pump Air flow: 400 SCFM (300 SCFM maybe sufficient) Total pressure drop: 22 inches water 25 in 5 HP motor 11 in 18 in

  9. Chiller • Unit to be investigated • Requirements: • 2 – 3 kW • Temperature: 75 deg F/24 deg C or -10 deg C ? • flow 300-400 SCFM

  10. Infrastructure power load • Heat load to the hall: • Up to 2-6 kW if all dumped to air • Much less if chiller is cooled by chilled water or has compressor and radiator outside • AC power: 2-6kW • Chilled water: 2-6kW if used