1 / 8

Team Unum

Team Unum. PDR #5 – 10/7/04 Flow Control and Pressure Sensing System. Control and Sensing Components. Flow Control: Achieved with Solenoid Pressure Sensing: Achieved with Pressure Transducer. Flow Control- The Solenoid. Two-Way Three-Way Normally Open Normally Closed Universal

paul2
Download Presentation

Team Unum

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team Unum PDR #5 – 10/7/04 Flow Control and Pressure Sensing System AME 470 – Team Unum

  2. Control and Sensing Components • Flow Control:Achieved with Solenoid • Pressure Sensing:Achieved with Pressure Transducer AME 470 – Team Unum

  3. Flow Control- The Solenoid • Two-Way • Three-Way • Normally Open • Normally Closed • Universal • Four-Way AME 470 – Team Unum

  4. Flow Control- The Solenoid • ASCO Valve • Model P/N 8320G184 • 24 Volts DC • 0-115 psi • Flow Coefficient: 0.35 • Time to inflate a basketball: 3.56 sec • Price: $89 AME 470 – Team Unum

  5. Pressure Sensing- The Transducer • “Home-made” Pressure Sensor from strain gauges and deformable material • Traditional Pressure Transducer • Flow-through Pressure Transducer AME 470 – Team Unum

  6. Pressure Sensing- The Transducer • Motorola MPX5700GP-ND • From Digi-Key Corporation • Req’d Voltage: 5 V • Accuracy: 0.5% • Pressure Range: 0-101.5 psi • Weight: <7 Oz. • Price: $18.19 AME 470 – Team Unum

  7. Pressure Sensing- The Transducer • Concept of configuration: AME 470 – Team Unum

  8. Upcoming Activities • Finalize Component Decisions and place orders • PDR #5: Electronics and Electronic Connections Thursday, October 14 Questions? AME 470 – Team Unum

More Related