Boiler MACT CISWI Rule

Boiler MACT CISWI Rule. Wes Thornhill, Chief Industrial Chemicals Section Air Division. Boiler/CISWI MACT. On June 4, 2010, four interconnected proposed rules were published in the FR Major Source Boiler MACT Area Source Boiler MACT CISWI Section 129 Rule Definition of solid waste.

pekelo
Download Presentation

Boiler MACT CISWI Rule

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Boiler MACTCISWI Rule Wes Thornhill, Chief Industrial Chemicals Section Air Division adem.alabama.gov

  2. Boiler/CISWI MACT • On June 4, 2010, four interconnected proposed rules were published in the FR • Major Source Boiler MACT • Area Source Boiler MACT • CISWI Section 129 Rule • Definition of solid waste adem.alabama.gov

  3. Boiler/CISWI MACT • Comment Period ends August 23rd. • Court ordered promulgation date of December 16, 2010. adem.alabama.gov

  4. Boiler/CISWI MACT • What’s covered? • Major Source Boiler MACT • Boilers at sources that have the potential to emit more than 10/25 of HAPs • Area Source Boiler MACT • Boilers at sources that are not Major HAP Sources • CISWI Rule • A unit that burns ANY solid waste. • RCRA solid waste definition adem.alabama.gov

  5. Boiler MACT • Boiler MACT (major source) • For units greater than 10mmBTU/hr, limits on the following • PM (surrogate for non-Hg metals) • Mercury • HCL (surrogate for acid gases) • CO (surrogate for non-dioxin organic HAPs) • Dioxin/Furan adem.alabama.gov

  6. Boiler MACT • Boiler MACT (major source) • Anticipated control device train • Carbon Injection  Baghouse  Scrubber • And good combustion practices adem.alabama.gov

  7. Boiler MACT • Boiler MACT (major source) • For ‘Gas 1’, Metal Process Furnaces and units less than 10 mmbtu/hr, a work practice standard (annual tune up). adem.alabama.gov

  8. Boiler MACT • Boiler MACT (major source) • ‘Beyond the floor’ • All major source facilities are to conduct an “Energy Assessment” • Energy Star adem.alabama.gov

  9. Boiler MACT • Boiler MACT (major source) • Testing (varies based on size and fuel) • Initial – PM, Hg, HCl, THC, Dioxin • Monitoring • > 100 mmbtu/hr = CO CEMs • > 250 mmbtu/hr = PM CEMs (non-gas units) • Parametric monitoring (opacity, Delta P, etc…) • Compliance • 30 Day average for CEMs, shorter terms for parametric adem.alabama.gov

  10. Boiler MACT • Boiler MACT (major source) Impact • EPA national estimates • Initial Cost = $9.5 Billion • Annualized cost = $2.9 Billion • Industry national estimates (AF&PA) • Initial Cost = $21 Billion • EPA benefits estimates • $17-$41 Billion in health benefits adem.alabama.gov

  11. Boiler MACT • Boiler MACT (area source) • Limits • Coal fired units • Mercury • CO as a surrogate for POM • PM (new units) • Biomass and Oil fired units • CO as a surrogate for POM • PM (new units) • Beyond the floor • Energy assessment adem.alabama.gov

  12. Boiler MACT • Boiler MACT (area source) • <10 mmbtu/hr • Annual tune up adem.alabama.gov

  13. Boiler MACT • Boiler MACT (area source) • Testing (varies based on size and fuel) • Initial – PM, Hg, CO • Monitoring • > 100 mmbtu/hr = CO CEMs • Parametric monitoring (opacity, Delta P, etc…) • Compliance • Parametric adem.alabama.gov

  14. CISWI Rule • Commercial and Industrial Solid Waste (CISWI) Rule • Burns ANY solid waste • Limits • Cd, CO, HCl, Hg, Pb, PM, SO2, NOx, dioxins/furans adem.alabama.gov

  15. CISWI Rule • CISWI Rule • Anticipated control device train • Carbon injection  Baghouse  Scrubber  SNCR  Afterburner • And good combustion practices adem.alabama.gov

  16. CISWI Rule • CISWI Rule • Testing • Initial and annual stack tests • Reduced testing frequency for good performance • Monitoring • CO CEMs • CO and PM CEMs for units >250 mmbtu/hr • Hg CEMs (kilns) • COMs (w/out scrubber) adem.alabama.gov

  17. CISWI Rule • CISWI Rule • Compliance • Hg monthly averages • Daily averages for other CEMs • 3-hour rolling averages for parametric • 6-minute for COMs • Annual control device inspections • Operator certification adem.alabama.gov

  18. Waste • Solid Waste Definition • The following are NOT solid wastes • Material used as fuel that remains within control of generator • Material used as an ingredient in a manufacturing process • Material that has been SUFFICIENTLY processed to produce a fuel • Material that has been confirmed through a case-by-case basis adem.alabama.gov

  19. Waste • Solid Waste Definition • Wastes • Treated wood, construction debris, off-spec used oil, tires • Non-wastes • Resinated wood, WWTP sludge, TDF (chipped tires with steel removed), on-spec used oil adem.alabama.gov

  20. Boiler/CISWI MACT • Concerns • Achievability, especially for smaller and area sources • FrankenMACT approach adem.alabama.gov

  21. Boiler/CISWI MACT • Concerns • “Furthermore, we already estimate no new CISWI sources will be constructed due to the costs associated with the MACT floor limits in the proposed NSPS.” EPA FR Vol. 75, No. 107, pg 31959 adem.alabama.gov

  22. Boiler/CISWI MACT • Concerns • Driving facilities away from wood and wood waste units, and towards natural gas • Wood is renewable • Wood is available • Wood may be considered carbon neutral • Woodwaste is not a consumer level fuel • Woodwaste may, otherwise, end up in landfills adem.alabama.gov

  23. Boiler/CISWI MACT • Concerns • Accuracy of PM CEMs • Some limits approach the edges of detectability • (1 ppm CO limit on liquid fueled boilers) adem.alabama.gov

  24. Boiler/CISWI MACT • Reminder! • Comment Period ends August 23rd. • Court ordered promulgation date of December 16, 2010. adem.alabama.gov

  25. Boiler/CISWI MACT Questions??? adem.alabama.gov