1 / 7

IBL PACKAGE SLIDERS

IBL PACKAGE SLIDERS. END BLOCK. Insert on the counterbore hole Ø2 of the end block. Ø2. 1.5. 0 .5. Ø3. INSERT INSTALLATION. On the IBL Integration stand . EOS RING. T hreaded rod M1.6 to fix the mushroom T hreaded insert M1.6 to fix the stave

perdy
Download Presentation

IBL PACKAGE SLIDERS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IBL PACKAGE SLIDERS

  2. END BLOCK • Insert on the counterbore hole Ø2 of the end block Ø2 1.5 0.5 Ø3

  3. INSERT INSTALLATION • On the IBL Integration stand

  4. EOS RING • Threaded rod M1.6 to fix the mushroom • Threaded insert M1.6 to fix the stave • 1 oblong hole on the upper side to allow positioning of end block insert Threaded rod Threaded insert

  5. EOS RINGS ASSEMBLY • End block screwed on the threaded insert

  6. EOS RINGS ASSEMBLY • Mushroom with smaller diameter (Ø2.8) than end block hole

  7. EOS RINGS ASSEMBLY

More Related