Town of Tecumseh. 2013 Capital Works Projects. Road Projects. Project Budget Road Paving Projects $572,000 Asphalting $272,000 Tar & Chip $250,000 Crack Sealing $50,000 Sidewalk Repair Program $69,000 Sidewalk Extension $30,000 Bridge Rehabilitation $1,690,000 Engineering & Construction.

phuc
Download Presentation

Town of Tecumseh

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Town of Tecumseh 2013 Capital Works Projects

  2. Road Projects ProjectBudget • Road Paving Projects $572,000 • Asphalting $272,000 • Tar & Chip $250,000 • Crack Sealing $50,000 • Sidewalk Repair Program $69,000 • Sidewalk Extension $30,000 • Bridge Rehabilitation $1,690,000 • Engineering & Construction

  3. Road Projects ProjectBudget • Malden Rd. Bridge Construction $50,000 • Rail Crossing Restoration $110,000 • Shawnee-Arbour Improvements $163,000 • Engineeringonly • Burke-Dumouchelle San. Sewer Extension $37,000 • Engineering only • Sign Reflectivity Study $17,000 Total Estimated Road Works$2,738,000

  4. Water Projects ProjectBudget • Burke-Dumouchelle Watermain Replacement $18,000 • Engineering only • Shawnee-Arbour Watermain $12,000 • Engineering only • Water Loss Audit $14,000 Total Estimated Water Works $44,000

  5. Wastewater Projects ProjectBudget • Burke-Dumouchelle San. Sewer Extension $28,000 • Engineering only • Shawnee-Arbour Improvements $25,000 • Engineering only • Lakewood Pump Stn & Storage Facility* $4,109,000 • Engineering & Construction Total Estimated Wastewater Works$4,153,000 *Preliminary only. Final design, cost estimates and funding options are still being refined.

  6. Stormwater Projects ProjectBudget • Burke-Dumouchelle San. Sewer Extension $15,000 • Engineering only • Shawnee-Arbour Improvements $100,000 • Engineering only Total Estimated Stormwater Works $115,000

  7. Carry-over Projectsfrom 2012 Budget ProjectBudget • Skyway Package Treatment Plant $608,000 Decommissioning • Brendan/Binder Sanitary Extension $1,496,000 • East Town Line Drain Enclosure & $11,850,000 Pump Station Upgrade (Facca) • Pump Stations – Back up Power $1,200,000 Installations Total Estimated Carry-over Budget $15,154,000

  8. SUMMARY CAPITAL PROJECTS • Total Estimated 2012 carry-over $15,154,000 Works • Total Estimated 2013 Works $7,050,000 Grand Total (2012 + 2013)$22,204,000