Status of the Transfer of CRYRING to FAIR

Status of the Transfer of CRYRING to FAIR. Håkan Danared. MSL, 2 February 2009. Developments during 2008-2009 Non-Technical. March 2008: Letter from FLAIR collaboration to FAIR and Swedish Research Council that FLAIR accepts CRYRING as the LSR.

Download Presentation

Status of the Transfer of CRYRING to FAIR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the Transfer of CRYRING to FAIR Håkan Danared MSL, 2 February 2009

  2. Developments during 2008-2009 Non-Technical • March 2008: Letter from FLAIR collaboration to FAIR and Swedish Research Council that FLAIR accepts CRYRING as the LSR. • June 2008: Discussion between MSL and the Swedish Research Council, where it is agreed that MSL will obtain 30 MSEK to cover the costs of keeping the ring at MSL though 2010, make the necessary modifications, and transfer it to FAIR. • February 2009: No contract yet between MSL and Swedish Research Council, mainly because of unclear rules about how FAIR is to accept in-kind contributions to experiments (my interpretation). Nevertheless MSL has started to spend the money.

  3. Developments during 2008-2009 Technical • Start of writing of Technical Design Report. Contains documentation of existing hardware, design of new systems, ... • CAD engineer hired to transfer CRYRING drawings on paper and in 2d Autocad to 3d CAD (Solid Edge). • Septum magnet and supply (Földi 2 kA, 28 V) given to the project from TSL. • Dag Reistad (retired from TSL) hired to prepare acquisition of kicker magnets with supplies. • Contacts with Imtech-Vonk for transfer of magnet power converters to FAIR, will visit Angela and GSI on Thursday to discuss technical details.

  4. Kicker Magnets For single-turn extraction, field strength 0.10 T, fall time (injection)/rise time (extraction) less than particle revolution time. • Zero:th order specifications for LSR • Current: 2.8 kA • Voltage: 22 kV • Rise/fall time: 200 ns • Stability: 1 % • Max pulse length: ? GSI specifications • Dag Reistad visited • CERN • GSI • Puls-Plasma-Technik • Danfysik coming to MSL next week • Contacts with Friatec, ScandiNova, ...

  5. Timeline Technical Design Report: Ready summer 2009 (optimistically) Design of injection and extraction: Until April 2009 Manufacturing (in-house, commercial): Until December 2009 Installations and tests: Spring 2010 Disassembly and transfer: Completed by 31 December 2010 Minor work possible after 2010, such as preparation of new ion-source platform