Making travel greener

Making travel greener. Train Characteristics. Very high weight at each activation (30-120 Tons) Slowing-down locations are repetitive Many activations per train. Product Benefits. When slowing down, energy is dissipated by heat. “ catching ” some of this energy may bring huge income.

ray-byrd
Download Presentation

Making travel greener

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Making travel greener

  2. Train Characteristics • Very high weight at each activation (30-120 Tons) • Slowing-down locations are repetitive • Many activations per train Proprietary

  3. Product Benefits • When slowing down, energy is dissipated by heat. • “catching” some of this energy may bring huge income. Proprietary

  4. Installation Sites • Train Station entrances • Hundreds of stations in Moscow – each railway line at each station has 2 sites • Train always slow at the same place Proprietary Granted

  5. Energy produced - Assumptions BumperOn gave 10kWh (for 15 flaps, 3.8ton car, 1000 cars/hour) 10 train-wag, 15 trains per hour = 150 train-cars/hour Train-wag weight ~30ton (7.5 ton/wheel) • Equivalent No. of cars = 150 × 30/3.8 = 1180cars/hour • If we take 100 flaps per location: 100/15 = 6.6 bumperOn P = 6.6 × 10kWh × 1180 / 1000 = 78.6 kWh Proprietary

  6. How much money can it make? Assumptions: 0.094 $/kWh price 15 hours traffic 320days per year Yearly Production – 78.6[kWh]*15[hours/day]*320[days/year]*0.094[$/kWh]=35,200$ Per Installation site!!! 2 Sites per line – More than 70,000$ Proprietary

  7. General Solution - 1 • Series of flaps – Pressed by the moving wheel (180) and bar (190) Proprietary

  8. Ron ChenPresident - Inventor - FounderTel: +972–4-6221373Mobile:+972–52-5673388E-mail: ron@bumperon.comWebsite: www.innopatent.com Making travel a little greener

  9. Thank You ! Proprietary