130 likes | 205 Views
Case for Cambodia. Team 6. Aaron Goodman. Lisa Andela. Eric Immerfall. Elizabeth Smit. Jordan Johnston. Presentation Outline. Review of Project Design Norms Preliminary Solutions Requirements Alternatives Feasibility Obstacles Resources Questions. Review of Project.
E N D
Case for Cambodia Team 6 Aaron Goodman Lisa Andela Eric Immerfall Elizabeth Smit Jordan Johnston
Presentation Outline • Review of Project • Design Norms • Preliminary Solutions • Requirements • Alternatives • Feasibility • Obstacles • Resources • Questions
Review of Project • Genesis Community of Transformation • Eden School of Agriculture • Master Plan Components • Water Distribution System • Sanitary Facilities • Common Building • Bridge Design • Renewable Energy Source Problem Review of Project Design Norms Preliminary Solutions Resources
Design Norms • Cultural Appropriateness: • Through the design, materials, and construction methods of the common Cambodian. • Transparency: • Communication about the simplicity and reliability of the design. • Integrity: • Design will facilitate relationships between people and their land. Problem Review of Project Design Norms Preliminary Solutions Resources
Sanitary Facility • Requirements • 2 Sinks, 2 Toilets, and 2 Showers • Gravity Fed Water System • Waste Removal Alternatives • Latrine Pits • Stabilization Ponds • Septic Tank • Feasibility • Sanitation is necessary and achievable anywhere http://www.rdic.org Problem Review of Project Design Norms Preliminary Solutions Resources
Water Distribution • Requirements: • Water to supply sanitary facility and irrigation • Filters for clean water • Feasibility: • Existing 140 ft well • Dry season irrigation • Detention pond, runoff collection • Water from the well to supplement • Safe Drinking Water http://www.rdic.org Problem Review of Project Design Norms Preliminary Solutions Resources
Common Building • Requirements: • 2 stories • 6m x 12m (about 20’ x 40’) • 10-12 dorm rooms • Use local style and materials • Feasibility: • Large groups purposes • Keep costs low • Long life in wet conditions • Size to fit in requests • Obstacles: • Finding information • Cultural Differences Problem Review of Project Design Norms Preliminary Solutions Resources
Common Building Roofing Alternatives FIRST FLOOR SECOND FLOOR Problem Review of Project Design Norms Preliminary Solutions Resources
Renewable Energy Source • Requirements: • Provide Energy to the Common Building and house • Must turn a variable supply into a dependant AC source • Feasibility: • Solar is feasible • Hydro is questionable • Wind is no longer an option • Preliminary Design: • 6-10 x 175 W solar panels • Charge controller • 10-14 maintenance free batteries • Inverter Problem Review of Project Design Norms Preliminary Solutions Resources
Bridge Design • Requirements: • Required to span the distance including the added depth of the wet season • Needs to be able to support the load of a small vehicle or tractor • Alternatives: • Three types of designs that are feasible at this point are slab bridges, truss bridges, and culvert with land bridge • Feasibility: • The biggest obstacle at this point is not having enough data to properly model each design Problem Review of Project Design Norms Preliminary Solutions Resources
Obstacles in Design • Distance • Site specifics • Communication • Climate/Weather • Cultural Differences • Standard building practices • Access to materials and site Problem Review of Project Design Norms Preliminary Solutions Resources
Resources • Roger Lamer – Industrial Consultant • Professor De Rooy – Team Advisor • Professor Dornbos – Biology Professor • Navy Chann-Chhay and Li Chhay – Owners of ESA • Jon Cooper – Formerly lived at the site • RDI – Resource Development International • ArjenLuxwolda – Managing Director of Kamworks Problem Review of Project Design Norms Preliminary Solutions Resources
Questions? Further questions…email us at: caseforcambodia@gmail.com