70 likes | 269 Views
Fermilab Test Beam Facility. Aria Soha All Experimenter’s Meeting October 20, 2013. Facility Usage. Facility Weekly Usage. Infrastructure. MCenter Control Room Walls T&M work – almost complete. HVAC – installing Shielding – ready to go Silicon Telescope
E N D
Fermilab Test Beam Facility Aria Soha All Experimenter’s Meeting October 20, 2013
Facility Weekly Usage http://www-ppd.fnal.gov/FTBF/
Infrastructure • MCenter Control Room • Walls T&M work – almost complete. • HVAC – installing • Shielding – ready to go • Silicon Telescope • Strip Telescope still in the works, • Pixel Telescope installed (out of beam) http://www-ppd.fnal.gov/FTBF/
HRT Area (M03) • Table installed • Remote controls need to be finished up by AD controls group • First experiment (T-1036) taking data • New Rules • Need to have an intensity minimum • Limit on interaction length of all material in beam • Time request must include a week for pre-setup and safety inspection http://www-ppd.fnal.gov/FTBF/
Schedule http://www-ppd.fnal.gov/FTBF/schedule • Now with Make-up Time • Booked until July 2014 • First Make-up slot is being used by T-992 • Need septa repaired. http://www-ppd.fnal.gov/FTBF/
TSW’s In Progress • Consistently have 5 TSW’s in works • Need Admin help http://www-ppd.fnal.gov/FTBF/TSW http://www-ppd.fnal.gov/FTBF/