1 / 9

DINO General Meeting

DINO General Meeting. Deployment and Intelligent Nanosatellite Operations (DINO). University of Colorado at Boulder January 21, 2004 Boulder, Colorado. DINO’s Mission Statement.

sahara
Download Presentation

DINO General Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DINO General Meeting Deployment and Intelligent Nanosatellite Operations (DINO) University of Colorado at Boulder January 21, 2004 Boulder, Colorado

  2. DINO’s Mission Statement The purpose of the student-led Deployment and Intelligent Nanosatellite Operations (DINO) mission is to determine cloud heights from space, evaluate the performance of intelligent operations, and assess deployment technologies for nanosatellites including a gravity-gradient boom, memory composite hinges, and thin-film solar arrays. Colorado Space Grant Consortium

  3. DINO’s Mission Objectives • Deployment Objectives • Demonstrate MicroSat’s Foldable Integrated Thin-Film Stiffened (FITS) solar arrays • Demonstrate Composite Technology Development’s Elastic Memory Composite (EMC) hinges • Evaluate the deployment of a gravity-gradient boom • Operations Objectives • Demonstrate MicroSat’s thin-film solar cells • Demonstrate Ball’s power system • Demonstrate wireless communication between the primary satellite and the tip mass • Intelligent Operations Objectives • Demonstrate autonomous scheduling, planning, execution, and rescheduling • Onboard evaluation of science and engineering data • Science Objectives • Measure cloud heights • Education Objectives • Educate students to design, build, and operate small satellites • Educate K-12 students about science and engineering using DINO Colorado Space Grant Consortium

  4. DINO’s Configuration • 25-kg primary satellite • 5-kg tip mass • 6-m static boom • One FITS deployable solar array out back • Two aerofins on the sides • Two science cameras • Etc… Colorado Space Grant Consortium

  5. System Configuration Diagram Tip-Mass ADCS Rate Gyro x3 Cam A Cam B TR1 Imaging TMComm PCB / FPGA Battery (?) TR2 MAG IB TR3 Power TM Lower LB Boom Release Mech Prim SA TM Cam Body SA Thermal PCB MLI Blkts Mechanisms Radiator Li-Ion Battery 28V Battery HOP EMC Hinges x4 Therm x30 EEDS Tip-Mass Upper LB Frangibolt x3 TxAnt / Radio / TNC Ext TNC Flight Computer Interface Board Legend RxAnt / Radio / TNC +5V Line Data Line Power Lines +/-12V Line Serial / I2C Comm Tip-MassAnt / Modem +15V Unreg. Line USB Data Bus +28V Line Wireless Colorado Space Grant Consortium

  6. Meetings for the Semester • Team Meetings will be held once a week • All team members are required to go to their team’s meeting • Systems Meetings will be held once a week • Team leads are required to attend and everyone else is welcome • General Meetings • These will occur when needed • Special topics will be covered at these meetings like Configuration Management • One representative from each team is required to attend and then report at their team meeting • Meeting Minutes and the presentation that was given will be available on the website http://spacegrant.colorado.edu/dino Colorado Space Grant Consortium

  7. Beginning of Semester Tasks • Determine how many more people are needed on your team. • Schedule a time to meet with Jen to go over your team’s detailed schedule. • Determine when your team’s weekly meetings are. • Get Jen your schedule of the semester if you haven’t already. • Input your schedule into http://calendar.colorado.edu Colorado Space Grant Consortium

  8. Semester Timeline • February 9-13: Subsystem Progress Check • March 8-12: Critical Design Review • April 19-23: End of Semester Peer Review • May – June: Subsystem Delivery • July: Integration Starts Colorado Space Grant Consortium

  9. New Students • A new student orientation will be held based on the schedules given to me • Talk to your team lead and get started • If you don’t have a team lead, talk to Jen • Explore the DINO website • http://spacegrant.colorado.edu/dino • For questions contact Jen Michels at michels@colorado.edu Colorado Space Grant Consortium

More Related