An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Section 3.2 Linear Programming Problems

  2. Linear Programming Problem A linear programming problem consists of a linear objective function to be maximized or minimized, subject to certain constraints in the form of linear equalities or inequalities.

  3. Ex. A small company consisting of two carpenters and a finisher produce and sell two types of tables: type A and type B. The type-A table will result in a profit of $50, and each type-B table will result in a profit of $54. A type-A table requires 3 hours of carpentry and 1 hour of finishing. A type-B table requires 2 hours of carpentry and 2 hours of finishing. Each day there are 16 hours available for carpentry and 8 hours available for finishing. How many tables of each type should be made each day to maximize profit?

  4. Organize the Information: Let x = # type A and y= # type B. The Profit to Maximize (in dollars) is given by: P = 50x + 54y

  5. The constraints are given by: Carpentry Finishing Also so that the number of units is not less than 0: So we have:

  6. Ex. A particular company manufactures specialty chairs in two plants. Plant I has an output of at most 150 chairs/month. Plant II has an output has an output of at most 120 chairs/month. The chairs are shipped to 3 possible warehouses - A, B, and C. The minimum monthly requirements for warehouses A, B, and C are 70, 70, and 80 respectively. Shipping charges from plant I (to A, B, and C) are $30, $32, and $38/chair and from plant II (to A, B, and C) are $32, $28, $26. How many chairs should be shipped to each warehouse to minimize the monthly shipping cost?

  7. Organize the Information: Number of Chairs Cost to Ship

  8. We want to minimize the cost function: C = 30x1 + 32x2 + 38x3 + 32x4 + 28x5 + 26x6 Production constraints: Plant I Plant II Warehouse constraints: A B C

  9. So the problem is: Minimize: Subject to: C = 30x1 + 32x2 + 38x3 + 32x4 + 28x5 + 26x6