1 / 9

Metropolitan Transit System

Metropolitan Transit System. Transit Serving Point Loma September 23, 2008. A California public agency established in 1975 through SB10 Comprised of San Diego Transit, San Diego Trolley, MTS Contract Services & Chula Vista Transit.

sanjiv
Download Presentation

Metropolitan Transit System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Metropolitan Transit System Transit Serving Point Loma September 23, 2008

  2. A California public agency established in 1975 through SB10 • Comprised of San Diego Transit, San Diego Trolley, MTS Contract Services & Chula Vista Transit. • Services include 3 Trolley lines, 82 fixed route bus lines, & Paratransit service. • Annual operating cost is approximately $204 million. Fare revenue Covers $80 million or 39% of annual operating cost. • Fleet includes 131 light-rail cars, 560 buses and 140 vans & minibuses. • Provides approximately 2.4 million hours of service across 31 million miles each year. • Carries approximately 90 million passengers annually, or 275 thousand each weekday.

  3. MTS Restructured System (2006) to: • Achieve Financial Sustainability • Optimize bus and trolley operations • Reduce or eliminate unproductive and duplicative services to “right size” system • Increase ridership (revenues) by making transit services more attractive and effective • Reconnect with our Markets • Detailed analysis of what is working and what isn’t • Identify markets that can and should be served • Respond to current mobility needs of our markets • Provide type and level of service our markets want and need

  4. MTS Service Concept

  5. Transit Serving Point Loma

  6. Airport Service: Route 923

  7. Airport Service: Route 992 Service every 15 minutes every day of the week

  8. Challenges Facing MTS • Capacity increases required by recent ridership gains • Service expansion • Securing new & expanded sources of revenue & subsidy

  9. Metropolitan Transit System Transit Serving Point Loma September 23, 2008

More Related