An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SHARED SERVICE FACILITIES (SSF) PROJECT

  2. Status of 2013 Established/Obligated Projects (as of 26 June 2014)

  3. Status of 2013 Established/Obligated Projects (as of 26 June 2014)

  4. 2013 Continuing Balance

  5. 2013 Continuing Balance

  6. 2013 Continuing Balance Implementation Plan

  7. Major reasons for Partially Operating SSFs • Equipment is still on test-run. • Awaiting additional request for other processing facility e.g. water system by the Cooperator. • Equipment returned to supplier because of technical problems, awaiting delivery of equipment. • Twinning and Handloom machines were destroyed by Typhoon Yolanda, equipment need replacement (Region 8). • Awaiting repair/completion of processing area/building. • Delayed in the installation of transformers and 3-phase electric power supply system. • Beneficiaries are still familiarizing themselves with the equipment; need additional training since they are used to manually-operated equipment. • Insufficient supply of raw material because of natural calamities/raw material is seasonal but equipment is being tested for use of other raw material. • Facility is underutilized since the initially identified market is not yet accessed, thus production is limited.

  8. Major reasons for Non-Operating SSFs • Equipment encountered technical problems during the test-run; returned to supplier. • Equipment delivered did not meet required specifications in the TOR, returned to the supplier. • Training on the use of the equipment was not yet conducted by the supplier. • Production/processing area still for repair/construction. • Cooperatorhas difficulty in providing their counterpart share – processing area, working capital and personnel. • Cooperator lack the technical and management capability to manage the project. • For areas affected by the Typhoon Yolanda, Pablo and Santi – processing area was destroyed, no supplier/scarcity of raw material.

  9. 2014 SSF Project Proposals Note: Internal DTI Target - 990 SSFs but DTI’s target submitted to DBM is 300 SSFs

  10. 2014 SSF Project Proposals

  11. Thank you.