An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bureau of Watershed ManagementPreliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007

  2. Themes for Change • Comprehensive requirements • Complimentary E&S/PCSM requirements • Reference water quality protection and permitting regulations • Post-Construction Stormwater Management

  3. Earth Disturbance Activities(other than agriculture) • Maintain a minimum vegetated buffer or riparian forest buffer width of 100 feet in special protection waters and a minimum of 50 feet width in waters other than special protection between disturbed areas and top of bank of a watercourse, or natural or artificial lake, pond, or reservoir • Develop criteria for management activities within buffer areas

  4. Planning and Implementation • ID special protection BMPs to protect and maintain the water from degradation in • special protection watersheds; or • where a TMDL has been developed for siltation • Post Construction Stormwater Management (PCSM) • Manage post construction stormwater volume, rate, and water quality • ID PCSM Plans and Narrative Requirements • Maintain a minimum riparian forest buffer from top of bank along a watercourse, or natural or artificial pond, lake or reservoir

  5. General • Reference design manuals for BMP design, installation and maintenance • Temporary stabilization standard and permanent stabilization standard • ID Property rights and off-site discharges • ID monitoring and inspection requirements • Include Preparedness, Prevention and Contingency (PPC) Planrequirements

  6. Permit Activities • 1-5 Acres with a point source discharge • 5 acres or more • 25 acres timber harvesting or road maintenance activities • 5 acres or more for oil and gas related earth disturbance activities • Operation and maintenance of PCSM BMPs

  7. IPs for Higher Risk Activities • Proposed project areas with extensive earth disturbance (e.g. 50 acres or greater) • Proposed project areas with high % impervious • Proposed PCSM volume or rate increases • Earth disturbance in sensitive areas such as headwater areas, steep slopes, geologic formations of concern, flood prone areas and wetlands

  8. Permit Applications • ID permit application requirements • Plans prepared and sealed by a qualified licensed professional • Revised permit fees • ID public notice and public hearing requirements and responsibilities • ID public access to information • ID permit approval, denial, and duration

  9. Permit Types • Permit-by-Rule • PCSM • Emergency remediation or clean-up activities • General Permit • Individual Permits • ID permit conditions • ID new and amended permits • ID re-issuance or renewal of permits • ID transfer of permit obligations • Verify completion and final plans • Permit termination

  10. Miscellaneous • Qualified local programs • Compliance & enforcement provisions • Antidegradation • ID water quality requirements • ID Total Maximum Daily Loads

  11. Timeline • Draft Development – Current • Internal development • Advisory Committees – Current/March 2008 • EQB consideration of draft rule – Summer 2008 • Public notice, comment, hearings • Revisions, comment/response • Final draft rule • Advisory Committees • EQB, IRRC, OGC