IceCube Collaboration Meeting 09/16/2008 Utrecht, Netherlands

Monitoring Shift 2008 – I3 Mainz Group. IceCube Collaboration Meeting 09/16/2008 Utrecht, Netherlands. Idea for Improvement #1: Automatical Alerts. http://i3moni.icecube.wisc.edu/cgibin/2008/run.pl?day=01&month=08&run=111395. Example: Run 111395 (shift taken by Florian) .).

seth
Download Presentation

IceCube Collaboration Meeting 09/16/2008 Utrecht, Netherlands

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MonitoringShift 2008 – I3 Mainz Group IceCube Collaboration Meeting 09/16/2008 Utrecht, Netherlands

  2. Idea for Improvement #1: Automatical Alerts http://i3moni.icecube.wisc.edu/cgibin/2008/run.pl?day=01&month=08&run=111395 Example: Run 111395 (shift taken by Florian).) ● 22 DOMs automatically marked by the potential problems flag ➢ 14 ATWD alerts (''no ATWD'') ➢ 2 SN RMS alerts (''increased rms'') ➢ 1 Tcal RMS alert All these alerts are long-scale problems (present in previous runs!)) ➢ 5 ''new'' alerts (DOMs 63-39 to 63-43, different issues) ➔ Idea: make use of the long-term monitoring to classify DOMs ● Same problem occurring in several subsequent runs: set known problem flag ● New problem: report an alert on the web page

  3. Idea for Improvement #2: Trigger References Example: Run 111396 (shift taken by Florian).) ● AMANDA_TWR_DAQ_STRING: reported deviation to reference run (Run 111395) of 13.1 σ ➢ Rate in Run 111395: 211.10 ± 0.10 Hz ➢ Rate in Run 111396: 212.81 ± 0.09 Hz ➔ First have a look at time evolution of trigger rates...

  4. Idea for Improvement #2: Trigger References Example: Run 111396 (shift taken by Florian).) ➔ First have a look at time evolution of trigger rates... ● Trigger rate in bins of 10 min (current run and ref run)) ● Average trigger rate per run (in long-scale context)) ➔ Trigger rate in current and previous run shows a stable behaviour ➔ Trigger rate fluctuating in the range 202-218 Hz

  5. Idea for Improvement #2: Trigger References Example: Run 111396 (shift taken by Florian).) ● To summarise: ➢ Rate in Run 111395: 211.10 ± 0.10 Hz ➢ Rate in Run 111396: 212.81 ± 0.09 Hz ➢ Between Run 111369-11140 rate fluctuating between 202-218 Hz ➔ Idea #1: think about error calculation ● Errors are too small compared to differences between average rates of subsequent runs ➔ Idea #2: think about a new reference method ● Get reference from long-scale observation / analyses

  6. Idea for Improvement #3: Hit rate reference Example: Run 111403 & 111404 (shift taken by Thomas).) ● AMANDA-OM ''08-06'' (OM 200): alert (hit rate deviation) reported for Run 111404, not for Run 111403 ➔ Have a look at time evolution plots...

  7. Idea for Improvement #3: Hit rate reference Example: Run 111403 & 111404 (shift taken by Thomas).) ● Fluctuations in Run 111402 (alert reported) and in Run 111403 (no alert) ● Smooth Run 111404: alert reported due to deviations from previous run ➔ Idea: Change reference method to avoid that ''fake'' problems are reported

  8. Idea for Improvement #4: Visibility & Speed Example: all runs.) ➔ some minor but annoying problems ● AMANDA Channel Multiplicity: Fair amount of the plot is hidden behind the legend ● Java applets e.g Dom map needs very long to get loaded ● The Colors of the maps are not always favorable for the needs ➔ compared to last years monitoring shift, the monitoring was faster and improvement could be seen….