1 / 7

Network Codes Update

Network Codes Update. GCRP # 34- February 2013. EirGrid 21 st February 2013 , Belfast. Network Code Overview and Status February 2013.

sibyl
Download Presentation

Network Codes Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Network Codes Update GCRP #34- February 2013 EirGrid 21stFebruary 2013, Belfast

  2. Network Code Overview and Status February 2013 The third legislative package for the internal energy market (Third Package), calls for ENTSO-E to undertake the drafting of network codes on the basis of framework guidelines adopted by ACER.

  3. Status update, as per February 2013 Orange = Submitted to ACER or ACER’s reasoned opinion has been received Black = NC out for consultation or consultation closed Grey = NC Drafting work Purple= Scoping or Final FWG being Developed, formal letter is expected.

  4. Summary -Status of the network codes Markets

  5. Summary -Status of the network codes System Development

  6. Summary -Status of the network codes System Operation

  7. JCRPLatest information on Network Codes Status is available on the ENTSO-E website. EirGrid 21stFebruary 2013, Belfast

More Related