An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BPM System StatusP. Cameron13 Aug 07

  2. Outline • Notes from NSLS-II Design Review(last Thursday) • System Block Diagram • Process Variables • DAQ status • PUE status • Meeting plans

  3. Notes from NSLS-II Design Review Committee members: Marc Ross (FNAL), B.X. Yang (APS), Om Singh (APS/NSLS-II), Gunther Rehm (Diamond), Bob Hettel (SLAC) • Bergoz in-flange transformers have epoxy vacuum breaks, they leak, use BPM sum signal instead • Button design looks good, may be concern with trapped modes with high current (>100mA) and short bunches (<15psec rms) • Considerable discussion of Libera - presently this is NSLS-II baseline, driven by manpower, crossbar and feedbacks • Libera has required extensive local support from existing users (several man years at Diamond), ‘plug and play’ perception may not be realistic • DESY is exploring Xilinx demo board approach as Libera alternative, we are contacting them • At Diamond all orbit feedbacks, both slow (~0.1Hz) and fast (~100Hz) are implemented with reflected memory, no real-time EPICS involve

  4. Suggestions for upcoming meeting agendas • July 30th – AP presentation/discussion on beam and machine modes, global naming convention, MPS reqt’s for commissioning • Aug 6th – joint AP/Diagnostics discussion on Process Variables, Diagnostics Prioritization (AP shifted emphasis to ‘system status’ discussions) • Aug 13th - Scraper/Collimator • Aug 20th – presentation and discussion of BPM status • Aug 27th – presentation and discussion of BLM status • Sep 10th – presentation and discussion of DCCT and differential current status • Sep 17th– presentation and discussion of Profile status • Sep 24th, Oct 1st – ???? • Oct 8th – Preparation for Design Review • Oct 15th – Design Review • Committee members – at least 2 from NSLSII, maybe more? • Promote collaboration with those guys • Igor Pinayev, Om Singh, Bob Dalesio, else??? Sequence???

  5. BPM (also FCT, DCCT, BLM,…) Block Diagram

  6. threshold?

  7. BPM DAQ Status Two approaches under consideration: • COTS Xilinx demo board • We understand how to interface this board to timing and controls systems, and provide for 1 sec and abort PVs • Presently available hardware requires design and fab of digitizer mezzanine (not an issue, but…) • Negotiating with vendors regarding design and release of complete BPM board as demo board • As suggested by review committee, discussing with DESY • Presently running for Differential Current • Libera • Not clear how to interface this box to timing and controls systems, and provide for 1 sec and abort PVs. Hopefully this will be clarified by demo box • Demo box due in at the end of the month • FPGA source code (~1GB!!!) downloaded, uses old (>2 years) Xilinx tools and Linux

  8. BPM PUE Status Buttons are in house (qty 70, 64 required presently) • 4 installed on BPM block, leak-checked, measured (S-parameters, DC resistance, capacitance,…), baked to 150C (cert to 200C, known problems with all vendors at 250C), re-measured • Remainder are awaiting tech time for testing and sorting • Cables – RG-223 order soon? HOM probes • Installed in 5 cell cavity transitions ‘soon’ (plating problem) • Cables? LMR-195? BTF – use buttons (buy broadband ~5W RF amplifier?)

  9. Suggestions for upcoming meeting agendas • July 30th – AP presentation/discussion on beam and machine modes, global naming convention, MPS reqt’s for commissioning • Aug 6th – joint AP/Diagnostics discussion on Process Variables, Diagnostics Prioritization (AP shifted emphasis to ‘system status’ discussions) • Aug 13th - Scraper/Collimator • Aug 20th – presentation and discussion of BPM status • Aug 27th – presentation and discussion of BLM status • Sep 10th – presentation and discussion of DCCT and differential current status • Sep 17th– presentation and discussion of Profile status • Sep 24th, Oct 1st – ???? • Oct 8th – Preparation for Design Review • Oct 15th – Design Review • Committee members – at least 2 from NSLSII, maybe more? • Promote collaboration with those guys • Igor Pinayev, Om Singh, Bob Dalesio, else??? Sequence???