1 / 6

INGAS Subproject SPA2

INGAS Subproject SPA2. 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler, Daimler AG. INGAS Subproject SPA2. WPA2.3 WP-Title: Hardware Procurement Main objectives of WPA2.3: Completion of all multi-cylinder engines.

tawny
Download Presentation

INGAS Subproject SPA2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INGAS Subproject SPA2 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler, Daimler AG

  2. INGAS Subproject SPA2 • WPA2.3 WP-Title: Hardware Procurement • Main objectives of WPA2.3: • Completion of all multi-cylinder engines. • Achievement of a uniform configuration of all engines. • Layout of crankcase ventilation system and procurement. • Status Summary of WPA2.3: •  All three engines completed and tested. • Conversion of engines 2 and 3 from CR = 13 to CR = 12. • Layout crankcase ventilation system completed and tested.

  3. INGAS Subproject SPA2 • Task A2.3.3 Multi cylinder engines generation 2 - Status: • Third multi-cylinder engine (gen. 2, engine number: YK0003173) was completed. • Initial test on engine test bench. • Conversion from CR = 13 to CR = 12 (piston InGAS-V1). • Handed over to Continental in March 2010. • Layout of crankcase ventilation system completed and tested. Final test including piping on engine test bench or vehicle still outstanding. • Investigations on engine test bench to improve cam phaser behavior carried out. A solution for satisfactory stationary operation was found. Transient behavior is still insufficient.

  4. INGAS Subproject SPA2 • Connecting of Ventilation Device • 2 blow-by outlets at the engine (above camshaft and on the side of the crankcase ) • 2 blow-by connections at the ventilation device • 1 oil return from ventilation device into oil pan • Specification • Measurement on AVL engine test bench • Blow-by: max. 70 dm³/min, • Separated oil: approx. 115 g/h, • (at n = 2000 rpm, 300 Nm, pcyl = 120 bar) • Gas outlet without oil • Status • - function tested on engine test bench: OK • mounting/piping for vehicle in preparation • final test including piping on engine test • bench or vehicle still outstanding gas outlet outlet above camshaft oil return blow-by crankcase outlet gas oil

  5. INGAS Subproject SPA2 • Next Steps (month19-24) • Redesign of slide rails with different material. Procurement of parts and retrofit of engines. • Repair of engine no. 1.

  6. INGAS Subproject SPA2 • Problems / Changes compared to plan • Engine damage due to wear of slide rail. • Engine No. 2 was sent to AVL as replacement. • Redesign of slide rails with different material is in progress. • Adjustment of cam phaser too slow. • Measurement of oil pressure in preparation.

More Related