Regional Transmission Network Development: Implications for Trade and Investment

Regional Transmission Network Development: Implications for Trade and Investment. Matti Supponen Administrator , DG-TREN, European Commission Keynote Address: Energy Community of Southeast Europe and Regional Electricity Market Development November 11-12, 2009. .

Download Presentation

Regional Transmission Network Development: Implications for Trade and Investment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regional Transmission Network Development: Implications for Trade and Investment Matti SupponenAdministrator, DG-TREN, European Commission Keynote Address: Energy Community of Southeast Europe and Regional Electricity Market Development November 11-12, 2009

  2. Energy Community of Southeast Europe and Regional Electricity Market Development USAID/USEA workshop “REGIONAL TRANSMISSION NETWORK DEVELOPMENT: IMPLICATIONS FOR TRADE AND INVESTMENT” Istanbul 11-12 November 2009 Matti Supponen Electricity and Gas Unit EUROPEANCOMMISSION

  3. Outline of the presentation • How the legal framework for electricity markets is developing? • How the market design is developing? • Future of European transmission planning • Conclusions

  4. 3rd market liberalisation package • EU Regulatory Agency • Site: Bratislava, Bucharest or Ljubljana • Stronger powers for national regulators • Cooperation of network operators (ENTSO-E) • ENTSO-E is already established, three committees: • system operation • market • system development • Effective unbundling of transmission networks • Three possibilities: • ownership unbundling • independent system operator • independent transmission operator

  5. TSO co-operation in the third package, tasks • Annual work programme and annual report • Network codes • Monitoring of implementation of codes • 10-year network development plan • Generation adequacy outlooks • Common network operational tools • Co-ordination of research

  6. Network codes

  7. Regional market approach Nordic UK/IE IPS/UPS Baltic CEE CWE SEE SWE CSE

  8. Market Integration Design project (MIDP) • Works under the Florence forum • Target model features: • Implicit day ahead auctions for the whole Europe, based on Central Matching • Capacity calculation “Flow based” • OTC perhaps in all timeframes, in particular intra-day • Cross border price difference hedging either by physical or financial rights sold by TSOs • EU balancing market

  9. Congestion management 2000 Implicit auctions Only explicit auctions Other methods Nord Pool Arnhem auction office

  10. Congestion management 2015 Implicit auctions Only explicit auctions Other methods Euro Pool

  11. The 20-20-20 EU policy by 2020 100% -20% -20% +20% 8,5% Greenhousegas levels Energyconsumption Renewablesinenergy mix

  12. 13% 16% 13% 30% 18% 25% 16% 18% 20% 23% 17% 13% 40% 23% 11% 13% 10% 14% 34% 15% 31% 24% 25% 14% 38% 49% 15% Member States’ targets EU-27 efforts in Renewables 2.2% BE BG CZ DK DE EE IE EL ES FR IT CY LV LT LU HU MT NL AT PL PT RO SI SK FI SE UK RES share in 2005 9.4% 6.1% RES share in 2020 17.0% 5.8% 18.0% 3.1% 6.9% 8.7% 10.3% 5.2% 2.9% 32.6% 15% 0.9% 4.3% 0% 2.4% 23.3% 7.2% 20.5% 17.8% 16% 6.7% 28.5% 39.8% 1.3% Based on 2005 starting point, recent progress and a balanced sharing of the effort, weighted by GDP/capita

  13. A Commission view on how we get there… GWh T H E Heat pumps Wind Biomass electricity Hydro

  14. 10-year network development plan • Until now, no European network plans have been made, only compilation of national plans • Two regional plans forerunners: • Nordel • SECI • ENTSO-E will deliver the first (pilot) 10-year network development plan in June 2009 • Important issues under discussion: • Scenarios, which one to use • Criteria for selection of projects

  15. European funding for Electricity infrastructure • Recovery plan projects • 925 M€ of EU money • 7 interconnector projects • of which 5 Direct Current lines • 4 internal line projects • Transeuropean Networks funds • 25 M€/year for electricity and gas

  16. Summarised • Third package is big step towards a European Electricity market • Expectations for the Agency and ENTSO-E are high • Market Integration Design project should make a market design for Europe • Energy invetments are driven by climate change targets • New transmission infrastructure urgently needed