ARCHITECTURE STUDY I REVIEWED ARCHITECTURE DOCUMENTATION II INTERVIEWED:

ARCHITECTURE STUDY I REVIEWED ARCHITECTURE DOCUMENTATION II INTERVIEWED: MANAGEMENT PERSONNEL DATA PROCESSING PERSONNEL SYARIKAT TELEKOMS MALAYSIA (SM) PERSONNEL IBM PERSONNEL III ANALYSED FINDINGS & REVIEWED WITH DATA PROCESSING PERSONNEL

Download Presentation

ARCHITECTURE STUDY I REVIEWED ARCHITECTURE DOCUMENTATION II INTERVIEWED:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARCHITECTURE STUDY • I REVIEWED ARCHITECTURE DOCUMENTATION • II INTERVIEWED: • MANAGEMENT PERSONNEL • DATA PROCESSING PERSONNEL • SYARIKAT TELEKOMS MALAYSIA (SM) PERSONNEL • IBM PERSONNEL • III ANALYSED FINDINGS & REVIEWED WITH DATA PROCESSING • PERSONNEL • IV PRODUCED MANAGEMENT PRESENTATION • V PREPARED AND SUBMITTED WRITTEN REPORT

  2. C&L ARCHITECTURE EXPERIENCES • * FEW BANKS USING HOT BACKUP OF MAINFRAMES • * CONTINUOUS RUNNING SYSTEMS WIDELY USED FOR HIGH RELIABILITY APPLICATIONS • * TYPICAL U.S.A. BANK SERVICE LEVELS — INTERRUPTIONS • 98% AVAILABILITY (1% PROCESSING, 1% TELECOMMUNICATION) - INTERRUPTION MANAGEMENT OBJECTIVE < 30 MIN. PER • EVENT • RELIABILITY MANAGEMENT - SYSTEMS TESTING OF RELEASES (SYSTEMS & • APPLICATIONS SOFTWARE) - FREQUENCY < 1 PER WEEK • TYPICAL SERVICE LEVELS — DISASTERS • ONLINE CRITICAL PROCESSING • - 1 DAY RECOVERY • - OTHER PROCESSING • - 1 WEEK DELAY FOR MOST APPLICATIONS (UNTIL COLD SITE POPULATED)

  3. SERVICE LEVEL REQUIREMENTS • * EXECUTIVE DIRECTOR • - EXCELLENT RESPONSE TIME EXCEPT AT 1 OR 2 PEAK/PEAK PERIODS PER YEAR • * GENERAL MANAGER, TREASURY • 99% AVAILABILITY BUT WILL SETTLE FOR 98% IF OUTAGES ARE CONSISTENT AND OF SHORT DURATION • - EXCELLENT RESPONSE TINE EXCEPT AT AM UNUSUAL PEAK/PEAK PERIOD • * MANAGER, METHODS & SYSTEMS • - INTERRUPTION DURATIONS < 1 HOUR (99% AVAILABILITY ) • - NUMBER OF INTERRUPTIONS PER MONTH ≤ 2 (99% AVAILABILITY )- EXCELLENT RESPONSE TIME DURING MONTHLY PEAKS • * INTERNAL AUDIT • - ATM INTERRUPTION DIJRATION 2 HOURS (DURING BANKING HOURS) • SERVICE LEVEL CONPUTAT1ONS • (10 HRS/DAY: 25 DAYS PER MONTH OF BRANCH OPERATION S) • 98% = 5 HRS DOWN PER BRANCH PER MONTH • (½ DAY PER MONTH) • 99½% = 1 HR DOWN PER BRANCH PER MONTH

  4. APPLICATION PROCESSING REQUIREMENTS • * EXECUTIVE DIRECTOR • — MANAGEMENT INFORMATION SYSTEM — CUSTOMER INFORMATION SYTEM — EFT SHARING A FEW YEARS AWAY • * GENERAL MANAGER, ADMINISTRATION • — EXECUTIVE INFORMATION SYSTEM (OPERATIONS & FINANCIAL) — CUSTOMER INFORMATION SYSTEM • * GENERAL MANAGER, TREASURY • — OWNERSHIP RESPONSIBILITY ASSUMED BY SPECIFIC USERS • (NEEDED FOR APPLICATION PROCESSING SERVICE LEVEL AGREEMENTS AND RELEASE MANAGEMENT APPROACH) • * EDP AUDIT • — TIGHT CONTROL OF DIAL IN CAPABILITIES • * DOMESTIC BANKING • — CUSTOMER INFORMATION SYSTEM — LOAN ORIGINATION AND PROCESSING SYSTEM • * OTHER POSSIBLE SYSTEMS TO BE IDENTIFIED IN IS PLAN • — PROPERTY/BUILDING ASSET REGISTER/MANAGEMENT SYSTEM — STORES INVENTORY SYSTEM — ETC.

  5. OTHER FINDINGS • * EXECUTIVE DIRECTOR • — MAJOR EFT, POS, AND HOME BANKING NOT EXPECTED FOR • SEVERAL YEARS • * EDP AUDIT • - STAFF SHOULD BE DEDICATED) TO A CENTRE • (ACCESS TO ONE SITE DOES NOT AUTHORISE ACCESS TO OTHERS) • - OFFSITE STORAGE ON ALTERNATE SITE IS ACCEPTABLE • * IBM • — HIGH AVAILABILITY PROGRAM REQUIRES: • INTEGRATED RELIABILITY MANAGEMENT PROGRAM (HARDWARE, FACILITIES, SYSTEMS SOFTWARE, APPLICATIONS SOFTWARE AND TELECOMMUNICATIONS) • — INTERRUPTION MANAGEMENT PROGRAM (TRAINING AND • PROCEDURES FOR RAPID RESTART)

  6. TELECOMMUNICATION FINDINGS • * DISSATISFACTION WITH TELECOMMUNICATION FAULTS CAN BE DUE TO • SEVERAL CAUSES: • LOCAL LINES - POWER SUPPLY • MODENS/MULTIPLEXORS - WEATHER • TRUNKROUTE - HUMAN ERROR • * MICROWAVE TRUNKROUTES RELIABILITY • 99.97% — 99.99% • * COST OF TELECOMMUNICATIONS SIGNIFICANT • DATA - APPROXIMATELY $300,000 PER ANNUM VOICE - AT LEAST DOUBLE DATA COMMUNICATIONS COSTS • * TELEKOMS IS WILLING TO COOPERATE TO SOLVE BRANCH AVAILABILITY • PROBLEM • BRANCH DOWNTIME* NUMBER OF BRANCHES • <2% 64% • 2—5% 19% • 5—10% 12% • >10% 5% • * 10.00 AM — 3.00 PM, MON. — SAT. (THROUGHOUT 1986) • CENTRAL SITE COMPUTER DOWNTIME OVER PERIOD AVERAGED 2%

  7. OTHER ISSUES IBM CAPACITY PLANNING (SHARE GUIDELINES) ADD MEMORY TO KEEP PAGING RATE BELOW 35 PATH& ACTUATOR REQUIEMENTS (3380 SERIES DASD)

  8. OTHER ISSUES (CONT’D) • DATA BASE MANAGEMENT SYSTEM (DBMS) IMPLEMENTAION • - EFFECTIVE & EFFICIENT DBMS IMPLEMENTATION REQUIRES • EXTENSIVE EXPERIENCE AND TIME • CONVERSION OF EXTENSIVE APPLICATION PORTFOLIO NORMALLY IS A • FIVE YEAR PROGRAM • - FEW DBMS PACKAGES ARE EFFECTIVE FOR BOTH HIGH VOLUME • PRODUCTION AND MANAGEMENT INFORMATION USAGE • SUGGESTED APPROACH • EVALUATE AND SELECT DBMS USING THE PRIMARY SELECTION CR1TERIA OF: • — ABILITY TO SUPPORT CL, CIS, ETC PACKAGES • — FUNCTION AND PERFORMANCE REQUIREMENTS OF MIS AND ONLINE • PRODUCTION SYSTEMS • 2) SELECT INITIAL APPLICATION (CL, CIS, ETC) AND IMPLEMENT • 3) PRODUCE EXTRACT PROGRAMS FOR KEY PRODUCTION FILES • 4) CONVERT KEY MANAGEMENT INFORMATION TYPE APPLICATIONS TO DBMS • 5) EVALUATE AND CONVERT TV FEASIBLE II1CIIVOLIJME ONLINE APPLICATIONS • (THEIR PROCESSING OFTEN DOUBLES MIP REQUIREMENTS)

  9. OTHER ISSUES (CONT’D) • SUITABILITY OF TAR AS BACKUP SITE • ADVANTAGE: EXISTING & OPERATIVE SITE • DISADVANTAGES: QUALITY OF PHYSICAL BUILDING & SITE • — TOO SHALL TO HOLD COMPLETE THREE COMPUTER • CONFICURATION • — HIGH RISK SURROUNDING • — OLD, LOW QUALITY FACILITY • — SHARED BUILDING IN FUTURE • POTENTIAL FOR DISTURBANCE EFFECTING BOTH SITES • — CLOSE TO COURT HILL DATA CENTRE • — SAME KL TRUNK EXCHANGE • POSSIBLE SOLUTIONS • CONSTRUCT NEW SITE e.g. AT BANGI (HIGH COST) • 2) AWAIT A SHARED COMMERCIAL CONTINGENCY SITE (LOW COST)

  10. SUMMARY OF KEY RECOMMENDATIONS CONTINGENCY PLANIING — PRODUCE CONTINCENCY PLAN BASED ON COLD BACKUP ARCHITECTURE AND COMBINED LEASED AND CIRCUIT SWITCHED NETWORKS DATA PROCESSING ARCHITECTURE — MOVE PRODUCTION DATA CENTRE TO COURT HILL — UPGRADE CURRENTLY OWNED COMPUTERS T0 CAPABILITY REQUIRED TO PROCESS VOLUMES AND APPLICATIONS EXPECTED OVER NEXT SEVERAL YEARS TELECOMMUNICATIONS ARCHITECTURE — TERMINATE LEASED LINES AT BOTH COURT HILL AND TAR — IMPROVE QUALITY OF SERVTCE TO BRANCHES CURRENTLY EXPERIENCING BELOW PAR SERVICE LEVELS (JOINT PROPERTY, DATA PROCESSING, TELEKOMS, AND C&L PROJECT) — INITIATE PILOT USAGE OF CIRCUIT SWITCHED NETWORK