40 likes | 186 Views
Southeast Arizona Transmission Study Status Report BTA Workshop 1. Ed Beck, P.E. Tucson Electric Power May 22, 2008 Phoenix, Arizona. 2008 Milestones & Preliminary Schedule On Schedule – Outreach Added. Interim 2007 SATS Report January
E N D
Southeast Arizona Transmission StudyStatus ReportBTA Workshop 1 Ed Beck, P.E. Tucson Electric Power May 22, 2008 Phoenix, Arizona
2008 Milestones & Preliminary ScheduleOn Schedule – Outreach Added • Interim 2007 SATS Report January • Saturation Base Case for 3rd EHV strategy January • 10 Year Base Case for 3 EHV strategies January • 20 Year Base Cases for 3 EHV strategies February • Refine Strategies March • Construction schedules May • Stakeholder Outreach May/June • Cost estimates & economic analysis June • Draft Report with list of projects July • Sensitivity analysis August • 2008 SATS Report October • 2nd Stakeholder Meeting December
Stakeholder Process • TEP Saturated Load Study • Potential Future Substation Sites and Transmission Corridors Reflect Area Jurisdictions’ Existing Land Use Plans • May 9, 2008 Meeting – Follow up planned • FERC Order 890 OATT Attachment K • SWTC & TEP Holding Joint Session • June 5, 2008 in Tucson • 4th Q to be held December 2008
Coordinated Studies • Northwest SATS/CATS • SPRR Group Transmission Proposal • Possible New Study Sub-Group • Proposed Joint Study • SWTC, TEP, Trico and WAPA • South and West of Tucson