ASCEND Team's Journey: Building and Launching a Scientific Payload

Follow the Pima Community College ASCEND Team as they design, build, and launch a scientific payload in this NASA-sponsored project. Learn about their challenges, successes, and future plans.

Download Presentation

ASCEND Team's Journey: Building and Launching a Scientific Payload

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pima Community College ASCEND Team NW Campus ARIZONA SPACE GRANT CONSORTIUM SYMPOSIUM 19 APRIL, 2008

  2. Pima Community College ASCEND Team • Daniel Jerrim Instrumentation • Roscoe Vertein Design/Construction • Dr. Denise Meeks Faculty/Mentor • Mike Sampogna Faculty/Mentor Roscoe Denise Daniel Mike Roscoe Denise Daniel Mike Roscoe Denise Daniel Mike Roscoe Denise Daniel Mike Roscoe Denise Daniel Mike

  3. Background • Roscoe Vertein • Military weather • Mechanical aptitude • Love of physics • Daniel Jerrim • Obsession with technology • Basic computer knowledge • Passion for building/creating

  4. Motivation…?

  5. INESCAPABLESCIENTIFIC CURIOSITY NASA sponsored, ANSR affiliated And of course, the educational benefits

  6. The “Why?” • Astronomy students • Volunteer • Outside normal workload • Principle to practical • Building the “Toolbox” of knowledge • Needed another notch on the… pocket protector

  7. In the Beginning… • Submitted grant proposal for ANSR/ASCEND project • Smartest, cutest, most capable and imaginative students both from Astronomy 101 & 102 • Our team was formed, 2 instructors and 2 students

  8. The Plan • Received basic module design • Parts ordered • Duties divided according to expertise

  9. K.I.S.S.(Keep It Simple Stupid) B Battery TC Timing Circuit DC Digital Camera HTR Heater H HOBO S Sensor

  10. The Breakdown

  11. Electronics

  12. Fabrication

  13. Bringing It Together • Last minute changes • New logger • Malfunction with pressure logger interface • Overnight new pressure logger • New support/load bearing center pole • PVC tubing and cement untested at low pressure and temperature • Used lamp rod, washers, and nuts

  14. Preflight Orientation • Arrival • Observations • Networking with veteran teams • Examining their projects/experiments • The ASCEND rookies • Plenty of motivation • Lack of experience • The devil is in the details

  15. The Night Before Launch • Discussing the future of our participation • Preplanning our next payload • Here and now! • Burning the 3 a.m. oil • Removed panels for final setup • Tested all equipment operation • Checked and rechecked wiring • Set and reset programs

  16. The Breakdown

  17. Last Minute Preparations • Final convoy arrangements • Forecasting balloon course • Real-time payload tracking • Coordinating communications and route

  18. Preparing for Launch • Initializing payload • Fresh battery installation • Digital camera • Timing circuit • Heater • Final configuration of loggers • Final testing of camera • Aluminum tape seal of load • Flipping of outer switches

  19. Final Touches Power Switches Aluminum Sealing

  20. Filling of Balloon • Balloon filled with helium • Approximately 20% more than total combined weight of payloads • Four-person balloon-stabilizing team • Watch out for bursts of wind

  21. WINDY DAY!!!!

  22. Send Off • Payloads separated along cord • Aligned for launch

  23. The Chase • From Gila Bend to Black Mt. • Tracked by GPS Payload at 62,000 ft

  24. The Route

  25. The Recovery • GPS set to 32.8103,-111.3240 • 20 minutes by foot • Just east from Newman Peak

  26. Temp, °C 30.2° to -22.1° DewPt, °C 8.9° to -49.3° RH, % 35.0° to 5.1° Recovered Data

  27. What We Learned • Fabrication materials • Construction methods • Equipment reliability and functionality • Attention to detail • New questions to ask • Identified unpredicted power anomalies • Education • Temperature variation • Pressure changes with altitude

  28. Next Time… • Research • New equipment • Sensor capabilities • Data acquisition techniques • More time to work • Know who to contact for help • More Testing

  29. Solar power Single mother board GPS Radio Transmitter Multiple cameras Video Pressure Altitude Temp. - Inside payload - Outside Humidity Accelerometer EM radiation Future Project Plans

  30. Special Thanks • Jack Crabtree • ANSR • Susan Brew • Arizona Space Grant Consortium • NASA • ASCEND participants • Northwest Campus administration • Everyone at the launch and recovery • Mike Sampogna • Denise Meeks

  31. Questions?