An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MidSTAR-1 USNA / STP Bi-Weekly IPT 2 November 2006 USNA Small Satellite Program Prof Billy Smith, Director, USNA SSP 1Lt. Justin Hinman, STP Mission Manager Mr. Riaz Musani, Aerospace Corporation

  2. Status Board • Spacecraft complete • Environmental testing complete • Bakeout underway

  3. Schedule (rev. 11/02/06) • Week of: • 6 Nov: Closeout open MSPSP items; conclude bakeout • 13 Nov: Pre-ship review (16 Nov) • 26 Nov: Deliver to Cape • 4 Dec: Integrate onto IPS

  4. Programmatics • Requirements Verification: • MS-1-RV-2: Closed • Mass model: • MS-1-RV-10: Closed • MS-1-RV-11: Closed • MS-1-RV-12: Closed

  5. Risk