An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LS1 CPS Planning R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  2. LS1 CPS Planning Complex in Operation until 11/02/13 11/02 10/07 Physics Readyfor extraction 10/07/14 R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  3. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 11/02 11/03 01/05 10/07 18/03/13 - 31/05/13 Linac3 Argon Run until31/05/13 3MeV Tests in B152 R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  4. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 11/02 Powering tests EPC 11/03 01/05 10/07 11/02/13 - 11/03/13 Pre-LS1 tests. POPS + Magnet + AUG + Auto Transfer + 4 day access - all services ON. 01/05/14 – 22/05/14 Hardware Test Period Hardware Test Period 1/May – 22/May Powering Tests EPC R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  5. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 11/02 Powering tests EPC 11/03 Magnet tests SS15 Liberate MU14 MU55\57 MU75 01/05 Magnet tests 10/07 Physics 09/09/13 - 17/12/13 - Corrective magnet maintenance MU14, 55, 57, 75 Replacement F61N.DVT.01, F61N.BHN01 + Replace all flexible hoses Replace all flexible hoses Powering Tests EPC Magnet R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  6. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests R.Goward Maintenance Sealing Cranes 6, 20, 21 SS15 Liberate MU14 MU55\57 Sept.16 MU75 01/05 Magnet tests 10/07 Physics 11/03/13 – 12/09/13 Route Goward 13/09/13 – 27/03/14 Septum 16 Shielding 04/06/12 – 06/06/13 Access 11/03/13 – 06/05/13 Replacement 3 cranes Powering Tests EPC Magnet Civil engineering Lift & crane R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  7. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests R.Goward Maintenance Sealing SS15 Liberate MU14 MU55\57 Sept.16 MU75 PS PSS complex new access system commissioning 01/05 Magnet tests 10/07 Physics 01/06/13– 27/09/13 Access Doors Installation 01/07/13– 27/09/13 Switchyard 11/02/14 – 08/04/14 PS PSS Commissioning Requiring Tunnel Sharing Powering Tests EPC Magnet Civil engineering Lift & crane Access R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  8. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests HVAC HVAC R.Goward Maintenance Sealing • HVAC • HVAC • HVAC • HVAC • HVAC HVAC HVAC SS15 Liberate MU14 MU55\57 Sept.16 MU75 PS PSS complex new access system commissioning 01/05 Magnet tests 10/07 Physics 12/03/13 – 14/02/14 CV Complete rebuildof PS tunnel HVAC Stations Powering Tests EPC Magnet Civil engineering Lift & crane Access CV Ventil R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  9. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests • HVAC • HVAC R.Goward Maintenance Sealing • HVAC • HVAC • HVAC • HVAC • HVAC CV water HVAC HVAC SS15 Liberate MU14 MU55\57 Sept.16 MU75 PS PSS complex new access system commissioning 01/05 Magnet tests 10/07 01/06/13 – 21/12/13 Chilled water + Demin water (15/05/2013) by 21/11/13 PS CR cooling circuit should be available Powering Tests EPC Magnet Civil engineering Lift & crane Access CV Ventil CV water R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  10. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests • HVAC • HVAC R.Goward Maintenance Sealing • HVAC • HVAC • HVAC • HVAC SMH42 • HVAC CV water HVAC HVAC SMH16 SS15 Liberate SMH57 MU14 MU55\57 Sept.16 MU75 SEH23 Dummy PS PSS complex new access system commissioning 01/05 Magnet tests 10/07 Physics All septa (4) hardware and soft maintenance 11/11/13 – 20/12/13 Installation of new dummy septum in SS15 Powering Tests EPC Magnet Civil engineering Lift & crane Access CV Ventil CV water Septa (SE) R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  11. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests • HVAC • HVAC R.Goward Maintenance Sealing • HVAC • HVAC • HVAC • HVAC SMH42 • HVAC CV water HVAC HVAC SMH16 STP STP STP STP SS15 Liberate SMH57 MU14 MU55\57 Sept.16 MU75 STP SEH23 Dummy PS PSS complex new access system commissioning 01/05 Magnet tests 10/07 Physics All kickers hardware and electronics maintenance + Completion of MTE 01/17/13 – 25/11/13 Consolidation Beam Stoppers (11) Powering Tests EPC Magnet Civil engineering Lift & crane Access CV Ventil CV water Septa (SE) Kickers Collimation (STI) R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  12. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests • HVAC • HVAC R.Goward Maintenance Sealing • HVAC • HVAC • HVAC • HVAC SMH42 • HVAC CV water HVAC HVAC SMH16 STP STP STP STP SS15 Liberate SMH57 MU14 MU55\57 Sept.16 MU75 STP SEH23 Dummy PS PSS complex new access system commissioning Vacuum bake-outs 01/05 Magnet tests 10/07 Physics New vacuum chamber MU57 End of LS1 bake-outs to be defined for 2014 Powering Tests EPC Magnet Civil engineering Lift & crane Access CV Ventil CV water Septa (SE) Kickers Collimation (STI) Vacuum R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  13. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests • HVAC • HVAC R.Goward EL Maintenance Sealing • HVAC • HVAC • HVAC • HVAC SMH42 • HVAC CV water HVAC HVAC SMH16 STP STP STP STP SS15 Liberate SMH57 MU14 MU55\57 Sept.16 MU75 STP SEH23 Dummy PS PSS complex new access system commissioning Vacuum bake-outs 01/05 Magnet tests 10/07 Physics 29/07/13 – 08/11/13 PS + B355 Cabling 08/11/13– 20/12/13 TT2 Cabling Powering Tests EPC Magnet Civil engineering Lift & crane Access CV Ventil CV water Septa (SE) Kickers Collimation (STI) Cable EL (pow.) Vacuum R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  14. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests • HVAC • HVAC R.Goward EL Maintenance Sealing • HVAC • HVAC RF • HVAC RF RF • HVAC SMH42 • HVAC CV water RF HVAC HVAC RF SMH16 STP RF STP RF STP STP SS15 Liberate SMH57 RF MU14 MU55\57 Sept.16 MU75 STP SEH23 Dummy RF PS PSS complex new access system commissioning Vacuum bake-outs 01/05 Magnet tests 10/07 Physics Maintenance of PSC10MHz Maintenance/renovation PSVC13/20 & PSC40 & PSC80 25/11/13– 20/12/14 Installation of longitudinal damper system in SS02 Powering Tests EPC Magnet Civil engineering Lift & crane Access CV Ventil CV water Septa (SE) Kickers Collimation (STI) Cable EL (pow.) RF Vacuum R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  15. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests • HVAC • HVAC R.Goward EL Maintenance Sealing • HVAC • HVAC RF • HVAC RF RF • HVAC SMH42 • HVAC CV water RF HVAC HVAC RF SMH16 STP RF STP RF STP STP SS15 Liberate SMH57 RF MU14 MU55\57 Sept.16 MU75 STP SEH23 Dummy RF PS PSS complex new access system commissioning Vacuum bake-outs 01/05 Magnet tests 10/07 Physics • Replacement pick-up, FWS, sem-grid, BCT, WCM03, MTV15 + new controls • 16/09/13– 24/01/14 Realignment all MU + Equipment which have been moved Powering Tests EPC Magnet Civil engineering Lift & crane Access CV Ventil CV water Septa (SE) Kickers Collimation (STI) Cable EL (pow.) RF Survey Vacuum Beam instrumentation R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091

  16. LS1 CPS Planning Opening : 11/03/13 End LS1 : 01/05/14 CE CE CE CE 11/02 Lift B269 Powering tests EPC 11/03 Magnet tests • HVAC • HVAC R.Goward EL Maintenance Sealing • HVAC • HVAC RF • HVAC RF RF • HVAC SMH42 • HVAC Control CV water RF HVAC HVAC RF SMH16 STP RF STP RF STP STP SS15 Liberate SMH57 RF MU14 MU55\57 Sept.16 MU75 STP SEH23 Dummy RF PS PSS complex new access system commissioning Vacuum bake-outs 01/05 Magnet tests DSO tests PS Operations Cold Check-out PS Setup with Beam 10/07 Physics Readyfor extraction 10/07/14 Powering Tests EPC Magnet Civil engineering Lift & crane Access CV Ventil CV water Septa (SE) Kickers Collimation (STI) Cable EL (pow.) RF Survey Control Firedetection Vacuum Beam instrumentation R. Brown/S. Mataguez EN/MEJ/INJ LS1 CPS planning EDMS-1252091