70 likes | 183 Views
Cathode Production Status. Muon Week April10th 2003. A. Benvenuti. INFN Bologna. Ordered last October. Delivered. Ready for Shipping. Tape Shipment arrived at Custom House (only one more foreseen)
E N D
Cathode Production Status Muon Week April10th 2003 A. Benvenuti INFN Bologna
Ordered last October Delivered Ready for Shipping Tape Shipment arrived at Custom House (only one more foreseen) Disposables (Spacers, protective bags, shoe covers, brushes, blades….) cleared through Customs (Last shipment) Inventory of rejected items, spares needed is becoming crucial
Planned Shipments up to Spring 2004 Chimney One Shipment = 12 boxes with 943 Cathodes Shipment 9 Ready for loading; Shipment 10: 1 MB1 and 5 Phi Boxes ready on 08/04/03 187 732 Required + Spares
Keep Updated • Cathode production should be completed well ahead of the chambers: • Cathode should be stored in a cool area • Use early boxes first. Protective bags not used before February 2002 • Do not leave cathodes exposed to air for a long time, they attract smog use protective plastic film if they are stored outside bags. • Use Monocathodes, they cost as much as regular ones and they are counted in the total • Once cathode production is stopped, the assembly site must be cleared. • Must plan for cathode requirements beyond foreseeable spares
Cathodes Required for the Entire DT Construction ( with 19 Spares) MB4/8,12 produced in Legnaro Grand Total = 187 732 cathodes