An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Template N2Africa

  2. N2Ethiopia 2014 Stakeholders Planning Meeting Partner Institute: EIAR Implementing Centers:Debre Zeit ARC Melksa ARC Pawe ARC Research Team AngawTsigie (PhD) Holeta GetahunMitikuHoleta Negash demissie (PhD) DZARC SerkalemTamiru DZARC KidaneTumsa MARC Amare MARC Adane PARC TesfayeMidega PARC DAs and Experts at each wereda (Adaa, Gimbichu, Shalla, Adulala, Mandura)

  3. Target legumes and Project sites (Woredas) :- • Common bean: Shalla, Adulala • Common Bean and Soybean: Mandura • Chickpea: Adaa, ChefeeDonsa

  4. Diagnosis Activity Cluster Adaa (Ude, Denkaka), Gimbichu ( 1Kebele) = 30 Farmers Shalla ( ), Adulala ( ) = 30 Farmers Mandura (3 Kebeles) = 30 Farmers

  5. Work plan: Diagnosis Activity cluster – Adaa and Gimbichu • Actions: • 1. Procurement of inputs (seeds, fertilizer, inoculant required) • Calculate amount of each needed/trial location (farmer plot) and then for 50 formers plot • Total Trial locations (Farmers Plots) = 30 [2 Woreda (10 farmers / 3 Kebele)] • Variety = Arerti • Treatment 4 (-P -I, -P +I, +P -I, +P +I) but NPS/DAP • P rate= 10kg P/ha (25 Kg DAP/ha) • 2. Selection of trials locations = 30 Farmers [2 Woreda (10 farmers / 3 Kebele)] • 3. Engagement of farmers for establishment of trials • 4. Collecting of associated observations (soil samples, weather data etc.) • 5. Planting, managing, and harvesting the trials • 6. Data collection • 7. Reporting • 8. Budget • 9. MoU

  6. Work plan – Diagnostic cluster - (Adaa and Gimbichu)

  7. Work plan – Demonstration - (Adaa and Gimbichu)

  8. Work plan – Adaptation - (Adaa and Gimbichu)

  9. Work plan – Agronomic trials - (Adaa and Gimbichu)