SAFETY REQUIRED DURING CONSTRUCTION OF SUB-STATION

SAFETY REQUIRED DURING CONSTRUCTION OF SUB-STATION. By A.V.L.N. RAO, CHIEF MANAGER, WARANGAL CAO . SAFETY DURING CONSTRUCTION. Safety Policy of POWERGRID:

warwick
Download Presentation

SAFETY REQUIRED DURING CONSTRUCTION OF SUB-STATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAFETY REQUIRED DURING CONSTRUCTION OF SUB-STATION By A.V.L.N. RAO, CHIEF MANAGER, WARANGAL CAO

  2. SAFETY DURING CONSTRUCTION Safety Policy of POWERGRID: The company recognises and accepts its statutory and moral responsibilities for ensuring safe design, construction, operation and maintenance of equipment and for the provisions of safe methods of work and healthy working conditions.

  3. SAFETY DURING CONSTRUCTION Safety Principles: • Safety rules and principles are to protect people • Primary method of achieving safety is through isolation & earthing of equipment. • Specific instructions to be followed where these are not applicable (e.g. live line working) • Safety precautions to be maintained inside boundaries • Training of staff for safety • Ensuring compliance by systematic audit.

  4. SAFETY DURING CONSTRUCTION Safety Clearances:

  5. SAFETY DURING CONSTRUCTION Personal Protection Equipment (PPE)

  6. SAFETY DURING CONSTRUCTION Personal Protection Equipment (PPE)

  7. SAFETY DURING CONSTRUCTION Basic needs for fire : Oxygen, Fuel, Heat Fire Hazards & fire safety: (Causes) • Electrical short circuit, earthing fault • Smoking in non smoking area • Hot surface & excessive heat • Gas cutting, welding, splatter • Leakage of flammable liquid or gas • Accumulation of static charge • Open storage of flammable materials

  8. SAFETY DURING CONSTRUCTION Classification of Fires & Extinguishing material • Type-A : Wood, Paper, Plastic, Cotton (water) • Type-B : Flammable liquids (Foam, Powder, Co2, Halon) • Type-C : Flammable gasses (Powder, Co2, Halon ) • Type-D : Electric Fire (Halon, CO2, Powder) Do not use water for electric and flammable liquid fires Do not use Foam for electric fires Fire Protective equipment: Smoke detectors, Emulcifire system, Fire Extinguishers, FF system

  9. SAFETY DURING CONSTRUCTION Excavation • Dumping of Excavated soil. (Minimum 1.5 Mts. or half the depth of the pit which ever is more) • Angle of repose of soil as per design in the foundation shall be maintained . • De-watering arrangement shall be available (If necessary)

  10. Safety During Excavation ..Contd. • Working area shall be protected properly to avoid against fall of passerby or animal in the excavated pit. • Shoring & Shuttering shall be arranged to protect the loose rock/soil against fall . • Arrangement of proper illumination at construction site shall be available. (if required)

  11. Safety During Excavation ..Contd. • Proper/adequate arrangement shall be made for extension of electric supply. (Proper size of cable, Use of fuse, No loose connection for De watering pumps /Illumination /Electric compressors etc. if applicable). • Check for damage/Uneven settlement of foundation.

  12. Safety During Excavation ..Contd. • Ensure Life saver arrangements has been made during construction of well foundation in river bed. (Where necessary) • Check that the adequate arrangement is made for the storage of blasting material at safe place. (if required) • Check that the blasting materials is handled with due care at site. (If required)

  13. Safety During Excavation ..Contd. • Check that during blasting operation, Labour /Workmen/Passerby are at safe places and arrangement shall be made to inform public by caution markings (Red Flag)/Public Notices/Alerts/Controlled blasting • Check that the Blaster is holding the proper license issued by the appropriate authority, as per the Indian Explosive Act.

  14. Safety During Excavation ..Contd. • Check that the length of the fuse wire used during blasting operation is adequate. • Ensure Laying of temporary cable used for operation of Machines used during construction should not cause any danger for electrocution of workmen. • Check that PPEs i.e. Safety helmet, Safety shoes is used by blaster and their gang members during blasting

  15. Safety During Excavation ..Contd. • Ensure that before undertaking excavation, the soil has been tested and in case of availability of any explosive/ dangerous gas, necessary arrangement must be made to remove/ dilute such gases. • The position of underground installations such as sewers, water pipes and electrical cables shall be verified and in case of their existence, they must be isolated

  16. Safety During Excavation ..Contd. • Safety shall be ensured during the construction of Tr. Lines for buildings, structures etc. which are coming in the vicinity of the excavated area from collapse (if required) • Check that sufficient strong ladder of suitable length is available for ingress/ outgress of persons in the pit • Lone worker should not be allowed to work in the excavated area beyond shoulder level.

  17. Safety During Excavation ..Contd. • Check for any possibility of seepage of water from nearby pond/ river should be estimated and taken care of. • After excavation the work has been completed speedily and back filling done at the earliest.

  18. Safety During Foundation Casting. • Check construction materials are stacked at safe place and also does not cause any danger.(Away from pit by 1.5 mtrs. Or half the depth of the pit, which ever is more) • Check arrangement of illumination at Construction Site. (If required) • Ensure life saver arrangements has been made during construction of well foundation in River Bed

  19. Safety During Foundation Casting • Check that the Concreting Mixer machine is placed at a safe place. (Not very near to pit) • Inspection of excavations shall be made by a Competent Person every day. In case, possible cave in or slide is apparent, all working in the excavation shall be seize until the necessary precautions have been taken to safeguard the possible cave in or slide.

  20. Safety During Foundation Casting • Jacks and vertical supports shall be positioned in such a manner that the vertical loads are distributed equally and do not exceed the capacity of the jacks and the jacks are placed away from pit edge etc. • Proper Jacking arrangement is made to take the entire load of template

  21. Safety During Foundation Casting • Wire mesh rolls shall be secured in order to prevent dangerous recoiling action. • Lone worker should not be allowed to work in the excavated area. • Check that sufficient strong ladder of suitable length is available for ingress/ outgress of persons in the pit.

  22. Common Points – for safety. • Check for sufficient quantity of PPEs considering maximum numbers of erection gangs deployed at one time. • Supervisors/ Workmen have been provided with required healthy PPEs, Like (Safety helmet/Safety Belts/Safety Shoes/Gum Boot etc. as applicable)

  23. Common Points – for safety. • Availability of First Aid Box with required medicines at site. • Instruction Register is available at site • Ensure Supervisor / Gang Leader always issues instruction to the Workmen before start of work. • All driver and plant operators are holding valid driving license.

  24. Common Points – for safety. • Check the vehicle for rescue is available at site • Ensure engaged labour are aware of the job • Check that the unskilled labourers are not engaged in skilled job. • Ensure that supervisor/workmen engaged in the field are aware of First Aid Techniques

  25. Common Points – for safety. • Note the details of nearby Hospital / Doctor in case of emergencies arises. • At least one dry powder type of portable fire extinguisher shall be provided especially where explosive or blasting agents are used for excavation. • Check the competence Qualification/experience) of supervisor / gang leader of contractor.