HT-7 ASIPP Daily operation report May08-09, 2004 Operation team II 胡立群,沈飙,林士耀,李亚东 周倩,程永飞, 孙有文, 李聪
HT-7 ASIPP Total shots: #67192----#67370 • Schedule • Long pulse LHCD plasma • PSI issues
HT-7 ASIPP Vacuum and Wall • 内衬烘烤 30A,T>1100C, limiter 30~3000C • 内真空 2-3E--5Pa, 外真空 6E-4Pa • Tt=4100-4250A • 西低温泵再生 6:30-- • LHCD power for Long pulse plasma: P 360KW, 110-130kA/ne3=1.0 • PSI issues: #67306----#67332 (0:40—3:50) • Typical shots ( >8 seconds) 67250(8.43s), 67251(8.92s), 67258(8.34s), 67261(8.13s) 67262(8.1s), 67263(8.42s), 67280(8.77s), 67281(8.31s) 67282(8.58), 67283 (8.34s), 67285(8.5s),67289(8.11s)
HT-7 ASIPP Ip=133kA, ne3>1.0, 340kW LH
HT-7 ASIPP
HT-7 ASIPP Ip=110-120kA / Ne>1.0 / 290kW IBW
HT-7 ASIPP 其他 • 极向场:基本正常 • 采集和显示:正常 • 真空:一台低温泵凌晨再生 • 泵最佳再生时间? • Limiter cooling:流量计电磁阀修复 • 限制器温度采集4块采集板损坏 • PLHI and PLHR • Low wall recycling at initial phase • Sensitive initial density