6TH ANNUAL CONFERENCE. Asset Management and Performance–Based Maintenance Contracting in Georgia. Ernay Robinson-Perry Asst. State Maintenance Engineer. Georgia Road Network. 17,985 Centerline Miles 48,178 Lane Miles 1,248 Centerline Miles of Interstate 6,957 Lane Miles of Interstate.

xena-henry
Download Presentation

6TH ANNUAL CONFERENCE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 6THANNUAL CONFERENCE

  2. Asset Management and Performance–Based Maintenance Contracting in Georgia • Ernay Robinson-Perry • Asst. State Maintenance Engineer

  3. Georgia Road Network 17,985 Centerline Miles 48,178 Lane Miles 1,248 Centerline Miles of Interstate 6,957 Lane Miles of Interstate

  4. GDOT Owned Assets • GDOT is responsible for 60% of the state’s assets * The Financial Worth of the Vehicle Network extends far beyond materials and labor cost and is therefore omitted.

  5. Current RFQC – Qualified Contractors • CMC • Landscape Contractor • Herbicides • Short line Striping

  6. I-95 Contract 113 Centerline Miles 3 Year Contract July 1, 2011

  7. District 6 Contract 134 Centerline Miles Interstates 75, 59 and 24 State Routes 2, 3 and 3 Conn 3 Year Contract May 1, 2013

  8. P3 Project WelcomeCenters (9) Rest Areas (17) Currently Maintained through Custodial Contracts and Landscape Contracts. Facility Maintenance

  9. Questions Contact information erobinson@dot.ga.gov