1 / 5

Corporate Network Design - CND

CNS/ATM Steering Group Meeting at EASA Koln, 14-15 October 2008elmplementation Workshop Arthur LIEUWEN Office of the Director General EUROCONTROL www.eurocontrol.int. Corporate Network Design - CND. Flight Efficiency Plan -FEP.

yazid
Download Presentation

Corporate Network Design - CND

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CNS/ATM Steering Group Meetingat EASAKoln, 14-15 October 2008elmplementation WorkshopArthur LIEUWENOffice of the Director GeneralEUROCONTROLwww.eurocontrol.int

  2. Corporate Network Design - CND

  3. Flight Efficiency Plan -FEP CANSO, EUROCONTROL and IATA agreed a 5 Point Action Plan to respond to urgency of current crisis facing air transport industry; • Improvements will bring benefits • 470.000 Tons Fuel/year • 1.555.000 Tons CO2/year ~400M €/year • Plan aims to: • Tangible improvements to airspace design and management en-route & terminal areas; • Tangible improvements of airspace and airport utilisation

  4. ICAO Major Events- European Coordination Common European visibility and Commitment towards ICAO • World-wide Symposium on Net Centric Information, Montreal 2-4 June 2008; • Establishment of AIS-AIM SG • SESAR/Nextgen Openforum, Montreal, 8-10 September 2008; • Informal Meeting of International Standard-Making Organisations, Montreal 10-11 September 2008; • CEANS Conference, Montreal 14-19 September 2008; • Performance paper • AIG Divisional Meeting, Montreal 13-18 October 2008 • Just culture paper

  5. EANPG-COG Issues COG/41 Meeting in Norway, Bodo on 24-26 June 2008 • PBN Implementation TF established • Development of regional PBN Implementation plan; • Coordinate work • Present plan to EANPG/51 (2009) or earlier • Outstanding Proposals for Amendment e.g.: • A-SMGCS Levels 1&2; • Prolonged loss of communications; • STCA procedures; • Communication failure procedures in RVSM airspace

More Related