1 / 5

2003 LBA Ops meeting

2003 LBA Ops meeting. Tasso Tzioumis. Previous LBA ops meeting. 3 April 2003, Hobart Minutes on www.atnf.csiro.au/vlbi/reports/ 19 Action Items! Quick review Keep in mind during this meeting.

zeno
Download Presentation

2003 LBA Ops meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2003 LBA Ops meeting Tasso Tzioumis

  2. Previous LBA ops meeting • 3 April 2003, Hobart • Minutes on www.atnf.csiro.au/vlbi/reports/ • 19 Action Items! • Quick review • Keep in mind during this meeting.

  3. ? 1) Investigate whether a sufficiently sensitive broadband system (either 4-7 GHz or 6-8 GHz) can be constructed for Ceduna [Action Peter McCulloch] X 2) Make Mopra controllable from the PCFS [Action Chris Phillips] X 3) Commisioning of XY phase measurement system at Mopra [Action John Reynolds, Warwick Wilson] X 4) Reduction of difference in cable lengths at Mopra [Action Tasso Tzioumis] X 5) Modifications to CACAL/CATIE to reduce improve phase tracking at 22 GHz [Action Tasso Tzioumis, John Reynolds] X 6) Attempt a 3mm VLBI test experiment Narrabri-Mopra once final 3mm systems installed at each location. [Action Tasso Tzioumis] +? 7) HP synthesiser currently at Ceduna, to be returned to Parkes [Action Simon Ellingsen] + 8) Determine who is maintaining the Parkes maser, last serviced by NML in 1998 [Action John Reynolds] X 9) ATCA pipeline to provide online total flux measurement, plus a flag for bad fit (similar to work required for VO) [Action Dave McConnell] X? 10) Gain curves need to be produced for all antennas, particularly at higher frequencies. Email these to Roopesh for inclusion on LBA web site [Action John Reynolds, Simon Ellingsen, Jim Lovell, Tasso Tzioumis]

  4. ? 11) Produce a checklist for observers containing a list of information that should be entered into the PCFS log [Action Roopesh Ojha] + 12) Produce a small number of example key files for scheduling LBA experiments with Craig Walkers SCHED program [Action Chris Phillips] +? 13) Chris Phillips requires the frequency range for each of our receivers so that the information can be included in the SCHED databases [Action Brett Reid, John Reynolds] + 14) Investigate if its possible to make SCHED produce snap files with tape changes on the hour and how to get frequency information written into the .sum files [Action Tasso Tzioumis, Chris Phillips] + 15) It is desirable to produce a nice web version of the VLBI schedule such as is done for the ATCA. Dave McConnell will give a copy of his Java program used for the ATCA schedules to John & Jim. [Action Dave McConnell] +? 16) The correlator manual needs updating [Action Tasso Tzioumis] ? 17) We need better integration of the tape, proposal and correlator databases [Action Tasso Tzioumis, Jim Lovell] + 18) ATUC has requested notification to users who's proposals will expire. A list of project which expire during the next term needs to be produced prior to each TAC meeting [Action John Reynolds, Jim Lovell] X 19) AIPS++ is looking for specific science programs to support, we should put forward a list of VLBI requirements [Action Dave McConnell]

  5. Summary on Actions from ‘03 • 5/19 completed (+) • 7/19 not started (x) • 4/19 may have started (+? or x?) • 3/19 status not known (?) • Check again at end on what to carry forward!

More Related