An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Caterpillar ECF-2 Program • Test Criteria • Test Matrix • Results

  2. Caterpillar ECF-2 Test Criteria 500 hour – Steady State Test Cycle • Test Pass/Fail Criteria: • No Loss of Oil Consumption Control • No stuck rings/Loss of ring side clearance • No Liner Scuffing or Bore Polish • No Loss of Blowby Control • Measured Piston Deposits • EOT Oil Quality to be monitored

  3. Caterpillar ECF-2 Test Matrix

  4. Caterpillar ECF-2 Test Matrix * Test started at hot temp for first 100-150 hrs, then switched to Low Temp

  5. Caterpillar ECF-2 Test Results Summary • Discrimination? • Temperature sensitivity to deposits validated • Field concerns validated • Test conditions defined • Low Reference Oil (Ref 1) selected • High reference being sought • Onus on Oil/Additive Industry to supply

  6. Caterpillar ECF-2 Test Results Summary

  7. Caterpillar ECF-2 Test Results Summary

  8. Caterpillar ECF-2 Test Results Summary

  9. Caterpillar ECF-2 Test Results Summary

  10. Caterpillar ECF-2 Test Summary • Completing 4 more tests (2 high, 2 low Ref Oils) • Expected completion May 15, need extended time • Propose go forward with C13 test for CI-4 Plus • Taskforce Approval needed • ASTM / EMA agreement needed • Research Report and Test Procedure to be documented

  11. Caterpillar ECF-2 Test Matrix Plan All Tests to be conducted at the same low temp conditions

  12. Caterpillar ECF-2 Test Matrix Test completed 400 hrs Test completed 175 hrs Test completed 175 hrs

  13. Caterpillar ECF-2 Test Results Summary