Project Life Cycle

Project Life Cycle. Minimum time to complete. 6 Months. Preliminary Engineering Environmental Clearance Permitting. Design Detailed Design (18 mo) Land Acquisition (3 mo) Railroad Rights of Way (1 mo) Utility Relocation (3 mo) Local Agreements with Counties

adsila
Download Presentation

Project Life Cycle

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Life Cycle Minimum time to complete 6 Months • Preliminary Engineering • Environmental Clearance • Permitting • Design • Detailed Design (18 mo) • Land Acquisition (3 mo) • Railroad Rights of Way (1 mo) • Utility Relocation (3 mo) • Local Agreements with Counties • & Municipalities (1 mo) 24 Months Time 2 Months • Public Comment (15 days) • Federal Authorization (1-3 wks) • Advertise for Bid (3 wks) Shovel Ready (minimum time 32 months) 8 Months Construction • Priority to Projects expected to be completed within 3 years (2/17/12) • 50% Obligated within 120 days (8/17/09) • From H.R. 1-92 • Remaining 50% Obligated within 1 Year (2/17/10)

More Related