Status of MICE and Spectrometer Solenoids

Status of MICE and Spectrometer Solenoids. MICE Oversight Committee Meeting RAL, 24 April 2014. Paul Soler on behalf of the MICE Collaboration. Contents. Agenda of Meeting Organisation MICE general status by MICE-UK Work Package Spectrometer solenoid status Conclusion.

Download Presentation

Status of MICE and Spectrometer Solenoids

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of MICE and Spectrometer Solenoids MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration

  2. Contents Agenda of Meeting Organisation MICE general status by MICE-UK Work Package Spectrometer solenoid status Conclusion MICE OsC Meeting, RAL, 24 April 2014

  3. Agenda of meeting • MICE Oversight Committee meeting agenda • 11:45: MICE Status and Spectrometer Solenoids (P. Soler) • 12:10: Status of Focus Coils (R. Preece) • 12:30: Lunch • 13:00: Tour of R9 (Focus Coil and Spectrometer Solenoid) • 13:30: Spend in FY13/14 and Project Risks (R. Preece) • 14:10: Schedule and financial forecast for future years (A. Grant) MICE OsC Meeting, RAL, 24 April 2014

  4. New MICE Organisation • Personnel: • Spokesperson: Prof Ken Long (Imperial College) • Collaboration Board Chair: Prof Alain Blondel (U. Geneva) • MICE Project Manager: Mr. Roy Preece (STFC) • MICE Project Engineer: Mr Andy Nichols (STFC) • MICE UK Capital Project Associate: Mr Alan Grant (STFC) • Accelerator Integration Scientist: Dr J. Pasternak (Imperial) • Experimental Integration Scientist: Dr P. Hanlet (IIT) • US MAP Director: Dr M. Palmer (FNAL) • MICE US Construction Project Manager: Dr A. Bross (FNAL) • MICE UK Principal Investigator: Dr Paul Soler (U. Glasgow) MICE OsC Meeting, RAL, 24 April 2014

  5. General Status • Work Package 1: Project Management • MICE International Project Office (MIPO): construction of project

  6. General Status • Work Package 2: Mechanical Integration • MICE Hall Manager: John Govans West Wall Mezzanine (for Step IV) Rack room 2 MICE OsC Meeting, RAL, 24 April 2014

  7. General Status • Work Package 3: Electrical Integration • Focus coil quench detection system and control • Rack room 2: control racks, 30 kVA UPS • Decay solenoid power supply and quench detection Decay Solenoid power supply Step IV control racks MICE OsC Meeting, RAL, 24 April 2014

  8. General Status • Work Package 4: Absorber-Focus Coil Module • AFC integration: hydrogen turret + absorber in FC 1 • Focus Coil status: see Roy Preece’s talk Insertion hydrogen turret and absorber into FC 1 MICE OsC Meeting, RAL, 24 April 2014

  9. General Status • Work Package 5: Hydrogen delivery system • Most activity on integration of AFC • LH2 delivery system simplified due to PRY solution • HAZOP review: diagnostic system, expansion tank, vacuum relief valve, control system, nitrogen purge gas • Second LH2 absorber: ready to ship (KEK/Osaka) Insertion hydrogen turrent and absorber into FC 1 MICE OsC Meeting, RAL, 24 April 2014

  10. General Status • Work Package 6: RF Power • Delivery 2 MW power at 201 MHz at Daresbury (last OsC) • TIARA milestone met: installation RF amplifiers at MICE RF loads installed under mezzanine MICE OsC Meeting, RAL, 24 April 2014

  11. General Status • Work Package 6: RF Power • Delivery 2 MW power at 201 MHz at Daresbury (last OsC) • TIARA milestone met: delivery of >500 kW power from TH116 amplifier at MICE Final stage amplifier with triode valve MICE OsC Meeting, RAL, 24 April 2014

  12. General Status • Work Package 6: RF Power • Cavity tests at the MTA stand at Fermilab • RF workshop at Fermilab on 2 June 2014 with UK team (K. Ronald, T. Stanley) Tuner arms MICE OsC Meeting, RAL, 24 April 2014

  13. General Status • Work Package 7: Vacuum • The design of the vacuum system for Step IV is complete and has been mocked up in the MICE Hall. • A complete services inventory for the vacuum system has been compiled and is being used by the services design engineer to make the overall layout. MICE OsC Meeting, RAL, 24 April 2014

  14. General Status • Work Package 8: Magnetic Field Mitigation • Partial Return Yoke and floor fixing designs completed and sent out tender Partial Return Yoke (PRY) MICE OsC Meeting, RAL, 24 April 2014

  15. General Status • Work Package 9: Software and Computing • Computing and controls • Work Breakdown Structure • Finite-state-machine • implemented in EPICS Computing WBS Spectrometer solenoid control panel MICE OsC Meeting, RAL, 24 April 2014

  16. General Status • Work Package 10: Operations and analysis • MICE Experiment Management Office (MEMO): operations, maintenance and analysis MICE OsC Meeting, RAL, 24 April 2014

  17. General Status • Work Package 10: Operations and analysis • MICE Analysis Structure • Combination of simulation and analysis tools and physics activities MICE OsC Meeting, RAL, 24 April 2014

  18. General Status • Work Package 10: Operations and analysis • Target: operated at 0.8 Hz (April 2014) with little beam loss • Pneumatically activated proton absorber Target trajectory ISIS beam loss Magnet ramps S7 beam loss Proton absorber MICE OsC Meeting, RAL, 24 April 2014

  19. General Status • Work Package 10: Operations and analysis • First MICE physics paper published: D. Adams et al., “Characterisation of muon beams for the Muon Ionization Cooling experiment”, E. Phys.J. C73 (2013) 2582. • EMR delivered by U. Geneva – EMR run Oct. 2013 Muon decays in EMR MICE OsC Meeting, RAL, 24 April 2014

  20. General Status • Work Package 10: Operations and analysis • Step V vs VI running decision will be motivated by physics criteria and schedule, financial constraints • Expect collaboration decision before end of 2014 after careful evaluation Criteria for success MICE OsC Meeting, RAL, 24 April 2014

  21. Spectrometer Solenoid • Spectrometer solenoid status: • Completion of the assembly, training, 3D magnetic mapping and shipping to RAL of SS2 (October 2013) Magnetic field mapping SS2 at Wang NMR SS2 ready for shipping at Wang NMR MICE OsC Meeting, RAL, 24 April 2014

  22. Spectrometer Solenoid • Spectrometer solenoid status: • SS1 also assembled, trained and mapped at Wang NMR • SS1 is ready to be shipped to RAL (27 April 2014) Training sequence SS1 and SS2 SS1 at Wang NMR during final vacuum vessel assembly MICE OsC Meeting, RAL, 24 April 2014

  23. Spectrometer-Tracker integration • Integration of the spectrometer solenoid and scintillating fibre tracker • Trackers have been available for a number of years and commissioned with cosmic rays Individual tracker station MICE Tracker MICE OsC Meeting, RAL, 24 April 2014

  24. Spectrometer-Tracker integration • Integration of the spectrometer solenoid and scintillating fibre tracker • Installation tracker 2 in upstream SS2 completed 31 March 2014 and will be moved to MICE Hall 29 April 2014 Tracker 2 just before inserting into bore SS2 Tracker 2 in bore SS2 MICE OsC Meeting, RAL, 24 April 2014

  25. Spectrometer-Tracker integration • Integration of the spectrometer solenoid and scintillating fibre tracker • Installation tracker 2 in upstream SS2 completed 31 March 2014 and will be moved to MICE Hall 29 April 2014 Tracker 2 installed and light-guides in place Closed SS2 with tracker inserted MICE OsC Meeting, RAL, 24 April 2014

  26. Conclusions • MICE is proceeding towards Step IV • Many achievements in last six months: • New organisation with change of spokesperson • Mechanical and electrical integration being achieved • Hydrogen absorber inserted into FC • RF power in MICE Hall milestone achieved • Partial Return Yoke design achieved: out to tender • Target doubled rate and proton absorber completed • EMR delivered and running well • Spectrometer solenoid SS2 integrated with tracker 2 and SS1 completed at Wang NMR, ready for shipping • Focus coil status, schedules and resources to be shown by Roy Preece and Alan Grant in next talks MICE OsC Meeting, RAL, 24 April 2014