1 / 4

Plug-in Electric Vehicle Readiness Single-Family Residential Charging

Plug-in Electric Vehicle Readiness Single-Family Residential Charging. Doug Kim, Director – PEV Readiness August 6, 2010. Understanding PEV Owner Charging. 240 Volt Appliances in Home. Preferred Charging Locations. Access to 120 Volt, 3-prong Outlet.

cecily
Download Presentation

Plug-in Electric Vehicle Readiness Single-Family Residential Charging

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plug-in Electric Vehicle ReadinessSingle-Family Residential Charging Doug Kim, Director – PEV Readiness August 6, 2010

  2. Understanding PEV Owner Charging 240 Volt Appliances in Home Preferred Charging Locations Access to 120 Volt, 3-prong Outlet Source: Electric Power Research Institute

  3. Residential Charging Equipment Installation Q4 2010 2015? STATUS QUO STREAMLINED TECH SOLUTION • 32 – 50 days • 1/3 SCE • 2/3 Customer, Electrician & City • Sequential process with many opportunities to drop the ball between various parties • Rate selection drives hardware configuration • 1- to 2-week target* • Core PEV team to monitor & coordinate • Minimize downtime • Align processes with autos’ charging equipment installers • Improve permitting and inspection process • 2- to 3-day goal* • Edison SmartConnectTM may provide additional channel for EV load measurement • Ideally, electricians could handle entire customer experience Better coordination between parties can speed up installation process and lower cost to customers * Installation timeline targets & goals dependent on developments outside utility control 2

  4. Streamlining with OEMs and Third Parties OEMs • Direct PEV customers to utility for rate & service information • Consider rate implications in home upgrade quotes • Coordinate home audit and installation process • Develop best practices and common “rules of engagement” Customers Standards Organizations Car Manufacturers (OEM) PEV Ecosystem Charging Equipment Manufacturers State Government/ Agencies Equipment Installation Providers Local Government & Communities Charging Stations Operators Trade Associations/ NGOs Utilities Third Parties

More Related