1 / 17

Green Engineering PC Committee Meeting

Green Engineering PC Committee Meeting. Jason Slagle Valerie Lyons. Agenda. Review and approve minutes Meeting Rhythm Website Membership Roster Recent activities 2011 Activity Plan Organization New business. Charter.

chick
Download Presentation

Green Engineering PC Committee Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Green Engineering PCCommittee Meeting Jason Slagle Valerie Lyons

  2. Agenda • Review and approve minutes • Meeting Rhythm • Website • Membership Roster • Recent activities • 2011 Activity Plan • Organization • New business

  3. Charter The purpose of the Green Engineering Program Committee (GEPC) is to promote a holistic, systems approach to improved energy efficiency, sustainability, renewable energy and ‘cradle-to-cradle’ design. GEPC serves as the AIAA focal point for all “green” aerospace-related programs and technologies, and works synergistically with the appropriate technical committees to assure that the AIAA membership is adequately informed about all aspects of this critical aerospace activity.

  4. GEPC Meeting Rhythm • Past Meetings • ASM 2009 • Green Energy Technology Working Group Kickoff • JPC/IECEC 2009 • Green Engineering Working Group Meeting • October 2009 • Green Engineering Working Group Meeting • ASM 2010 • Green Engineering Working Group Meeting • July 2010 • Green Engineering Working Group meeting • JPC/IECEC 2010 • Green Engineering Program Committee proposal • ASM 2011 • Green Engineering Program Committee meeting • Future Meetings • April 2011 • Telecon on 29 April 2011 • JPC / IECEC • Face-to-face meeting at JPC / IECEC conference • October 2011 • Telecon on 28 October 2011 • ASM 2012 • Face-to-face meeting at ASM conference • GEPC holds face-to-face meetings at ASM and JPC/IECEC • Additional meetings (telecons) are held in April and October

  5. GEPC Website • Calendar of events and all files are available on website • https://info.aiaa.org/tac/pc/GEPC/default.aspx • Looking for a good webmaster

  6. GEPC Membership Roster • Jason Slagle (Co-Chair) • Valerie Lyons (Co-Chair) • Ashwani Gupta • Anthony Gross • Bob Winn • Craig Day • Stephen Johnson • Raymond Best • Michael Piszczor • Danielle Soban • Roger Hartman • Nathan Hicks • Michael Heil • Franz-Josef Uahlen • SatishMohleji • Essam Khalil • Bill Lear • Robert Dougherty • Bruce Walker • RamkumarParthasarathy • SubramanyamGollahalli • Peter Hollingsworth • HaroutAyvazian • David Lilley • Eliza Sheppard • DynaBenchergui • Richard Wahls • D. R. Reddy • Islam Ahmed • Anthony Watts • John Murray • Albert Glassman • Marty Bradley • Rebecca Somers • Henry Molintas • Keith Blodgett • Keiichi Okai • 37 members...and growing! • Need to encourage involvement from YPs

  7. Example PC Member Expectations Stay in Communication: Attend your appropriate subcommittee/working group meetings (reference matrix on roster workbook) Notify PC and Subcommittee Chairs if you are unable to attend Notify PC Secretary of changes in phone, email, etc. Participate Actively: In any combination of two subcommittees, conferences, or working groups Be the major contributor/leader of at least one of these activities Provide Support As: Conference Session Chair (Annually) Reviewer for Outstanding Papers PC Mentor Contributor to PC Newsletter Contributor to AA Highlights article When the Opportunity Arises: Submit PC Member Nomination 7

  8. GEPC Recent Activities • Identified liaisons for various related committees • Recruited members from the Technical Committees • Coordinated sessions for conferences (ASM, JPC, etc.) • Reviewed and contributed to two Key Issues for the Public Policy Committee • Reviewed and contributed to two information papers for the Public Policy Committee • Supported briefing sessions for Congressional Visits Day (CVD) • Authored a year-in-review article for Aerospace America • Submitted annual report covering GEPC status and activities • Hosted an Invited Session for ASM 2011 – “A Systems View of Energy Efficiency” • Hosted AIAA Robert M. Losey Award lecture (recipient – Patrick Minnis) Successfully transitioned to a Program Committee…off to a good start

  9. Identified a liaison to the Public Policy Committee Worked integrally with the new PPC Energy & Environment Subcommittee Reviewed and contributed to two Key Issues and information papers for the Public Policy Committee Climate Monitoring Alternative Fuels & Energy Efficient Aviation Systems Public Policy / Congressional Visits Day

  10. 2011 GEPC Activities • Submit completed annual report by Jan 25th • Create sessions for JPC and other TBD conferences • Complete TAC committee self assessment spreadsheet • Recruit members from the related Technical Committees • Author a year-in-review article for Aerospace America • Characterize key challenges for green in the aerospace industry • Coordinate sessions for conferences (ASM, JPC, etc.) • Review and contribute to Key Issues for the Public Policy Committee • Others??? Complete activities list with brainstorming list

  11. AIAA Hawaii Conference • Co-sponsoring three sessions • The Science Underpinning Aviation Impacts on the Environment • Aerodynamic Efficiency and Laminar Flow • Technology Addressing Aviation Impacts on the Environment • June 27-30 in Honolulu

  12. AIAA JPC / IECEC Conference • IECEC Theme: • Government, Academia and Industry Working Together Towards Clean Energy • JPC Theme: • Turning Propulsion Ideas into Reality • Sponsoring panel session on “Alternative Fuels and Sustainable Energy Systems” • Need session chair

  13. What do you want to get out of this committee? What are the top three activities the PC should focus on in the next year? See Excel spreadsheet for results GEPC Exercises from our last meeting

  14. Example TC/PC Organization (Chair “Down”) Chairman (YOU) Vice Chairman or Chair-Elect Steering Committee Secretary Liaison Procedures Membership Activities Committee Committee Focus Area Subcommittee Focus Area Subcommittee Public Policy Standards Student Activities Education Publications Awards Conferences Technical Panel Technical Panel Position Paper WG Standard/Guide WG Short Course WG Technical Panels/Working Groups 14

  15. Around the Room • Any new business items?

  16. CRITERIA A. Effectiveness of existing TC B. TAC governance C. Liaisons D.No. of TC meetings each year and how active are the TC members E. Special tasks by TC METRIC ITEMS FOR EACH TC EVALUATION A 1. Membership balance analysis A 2. Create/update a charter A 3. Number of foreign members (optional) B 1. Succession planning B 2. Training C 1. AIAA TC’s C 2. Local or Regional AIAA Chapters C 3. Other Professional Organizations ( i.e. SAE, ASME, etc. ) D 1. No. of Members that attend D 2. No. of TC members that actively work on your TC subcommittees E 1. Professional short courses E 2. Higher Educational Programs (Graduate and Undergraduate) E 3. K-12 Educational Programs E 4. Community Programs Publications: E 5. Books E 6. Design Guides E 7. News letters/Bulletins E 8. Journal Articles E 9. AIAA papers E 10. Aerospace America Articles Awards/Scholarships: E 11. Student (Graduate & Undergraduate) E 12. Young Engineers E 13. Lifetime achievement E 14. AIAA service Congress Contact: E 15. Participate in Congressional Day Visit Importance order 1 1 1 1 1 No. of Metric Items 2 plus 1 Optional Item 2 3 2 15 Points per Metric Item 5 5 5 5 5 Max Value of Metrics 10 plus 5 Optional 10 15 10 75 Max Percentage Evaluation Metric 7 plus 2% extra 2 9 5 10 TOTAL = 92.5 TC: GEPC A. 15 points B. 10 points C. 15 points D. 7.5 points E. 45 points Percent Eval each TC 9 2 9 3.75  6 Total = 77% Green Engineering PC

More Related