An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cambrian School DistrictBond Project UpdateMarch 6, 2014 Board of Trustees MeetingDr. Debbie BlowRick Kramer, Kramer Project Development Co.Linda Mao, Sugimura Finney Architects

  2. TOPICS • Bond timeline review • Fammatre 3 Classrooms update • Solar Project update • Steindorf Project update – • Lease opportunity at DO Workshop

  3. Bond Timeline Review We are here!

  4. FAMMATRE 3 CLASSROOMS UPDATE • Current status: • Budget: $1.65M • Construction documents are in the works using pre-approved plan • Target DSA “over the counter” review March 16 • Lease, leaseback with Bruns Belmont for the building. Award March 20 • Bid sitework and utilities. Award April 3 • Start construction end of April • Complete construction mid August

  5. Fammatre Site Layout 3 New Kindergarten CR’s

  6. Fammatre Classroom Layout

  7. SOLAR PROJECT UPDATE • Current status: • Budget: $4.7M • Request for Proposals is being drafted by KPDC • Send to solar providers in March • Receive proposals and select solar provider in April • April notice to proceed with design • September or October possible construction start

  8. STEINDORF PROJECT UPDATE • Current status: • Budget: $16.5M • Committee established STEAM requirements • Curriculum synopsis board presentation tonight • Building requirements board presentation tonight • Proceed with Schematic Design (SD) • SD presentation to board on April 17 • April – May. Pause until bond election. • June 2014 – April 2015 CEQA, construction documents, permitting and bidding • May 2015 construction start

  9. STEINDORF PROJECT UPDATE STEAM Curriculum Synopsis: • School-wide focus on STEAM Curriculum • Project-based learning: “Learning by doing” • STEAM Labs and Makers Labs • Integrated Curriculum • Common Core State Standards in action • More informational Text • Depth of Knowledge • The 4 Cs of 21st Century Skills • Risk Taking

  10. STEINDORF PROJECT UPDATE Putting the “A” in STEAM • Four areas of the Arts • Visual Arts • Music • Theater Arts • Dance • Integrated Curriculum Examples • Mathematics – Visual Arts & Music • Language Arts – Theater & Digital Media • Science – Visual Arts, Music, & Makers Labs • Physical Education – Science & Dance

  11. STEINDORF PROJECT UPDATE • STEAM Space Requirements: • Modernize existing buildings totaling 25,000 sf and add two new buildings totaling 9,000 sf. Sustainable construction with LEED certification. • 2 modernized classrooms per grade K8 = 18 CR’s (1 is new) • Flexible multi-use space for dining, performing arts, PE • Typical administrative support spaces and restrooms • Flexible Media Center • Flexible Makers Labs • Flexible Science Lab • Flexible outdoor learning spaces in courtyards • Outdoor amphitheater for performing arts • Parking and play areas

  12. Steindorf Conceptual Siteplan

  13. Steindorf Conceptual Images

  14. Steindorf Conceptual Images

  15. Steindorf Space requirements

  16. Steindorf Space requirements

  17. Steindorf Space requirements

  18. Steindorf Space requirements

  19. Lease opportunity at DO • Potential ability to accommodate some displaced Steindorf Tenants at the DO • Existing workshop 3,500 sf is underutilized. Could be quickly renovated and leased along with some of maintenance yard. • Build a new smaller workshop. 2,000 sf • Expand maintenance yard into front parking lot. • Estimated cost around $1.3M

  20. Lease Opportunity at DO

  21. Time for questions, discussion, opinions, direction.