An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Corrector Development Status of the Corrector R&D in the Frame of the Phase I Upgrade Project M. Karppinen CERN TE-MSC

  2. Acknowledgements STFC-RAL, UK A. Brummitt, M. Courthold, S. Jones CIEMAT Spain P. Abramian, F. de Aragón, J. Calero, J. de la Gama, L. García-Tabarés, J. L. Gutiérrez, T. Martínez, E. Rodríguez, L. Sánchez, F. Toral, C. Vázquez CERN N. Dalexandro, N. Elias , L. Favre, O. Gumenyuk, A. Kuzmin, M. Karppinen, J. Mazet, L. Oberli, J-C. Perez, D. Smekens, V. Sytnik, G. Trachez, G. Villiger M. Karppinen CERN TE-MSC

  3. Outline IR Corrector layout & parameters for Phase I upgrade Radiation environment Orbit correctors Skew quadrupole Higher order multipoles Summary M. Karppinen CERN TE-MSC

  4. IR Corrector Layout for Phase I Corrector Package (CP) M. Karppinen CERN TE-MSC

  5. Corrector Package (CP) MCXSO MCXO MCXSS MCXS MCXT MQXS MCXBV MCXBH IP ~0.5 m ~0.5 m ~0.5 m ~0.9 m ~1 m ~1 m M. Karppinen CERN TE-MSC

  6. Correctors in Q2 Q3 Q2b Q2a Q1 MCXBH/V (H&V) MCXB V/H (H&V) MQXC MQXC MQXC MQXC 10 m 1..1.3 m 7 m 7 m 1..1.3 m 10 m • Base-line (HV and VH) orbit corrector scheme allows controlling the orbit to a level 3 times larger that then BPM resolution. • To reach the same level as the effective BPM resolution : • Provide 1.5 Tm (1.8 Tm) in H&V-plane in BOTH locations. • Feasibility study was initiated on combined H/V-corrector that meets the reliability requirements • An extra H/V pair means: • Magnet R&D, material R&D, design, component & tooling procurement • Additional powering and protections circuits REF: S. Fartoukh, R. Tomas, J. Miles: “Specification of the Closed Orbit Corrector magnets for the NEW Inner Triplets”, sLHC Project Report 030 M. Karppinen CERN TE-MSC

  7. Expected Radiation Levels CP & Q2 Luminosity: 2 L0 = 2 ×1034 cm-2 s-1 & 1000 fb-1 Peak dose CP:~50..65 MGy ø120 mm, no shield~30..35 MGy ø140 mm, no shield~10 MGy ø140 mm, 10 mm SS Peak dose in Q2 (with 13 mm liner in Q1):~28 MGy, ø120 mm, no shield~ 8 MGy ø140 mm, 10 mm SS Base-line for IR correctors: ø140 mmcoil aperture with 10 mm Stainless steel shielding (i.e. ø120 mm free aperture) Courtesy of F. Cerrutti & A. Mereghetti EN-STI, FLUKA-team M. Karppinen CERN TE-MSC

  8. Requirements.. • Very hostile environment • Material selection (insulation, head spacers, shielding etc..) • Spare policy • “Intervention friendly” design of cryo-magnets • Radioprotection • Reliability: • MCXB must work, no redundancy M. Karppinen CERN TE-MSC

  9. MCXB Initial 2-Layer Design (Bint= 6 Tm) M. Karppinen CERN TE-MSC

  10. MCXB and MQXS(1: Strand & Cable *) extracted strand March -09 275 km SC-strand in stock at CERN Polyimide Insulation: 2 x 25µm + 55 µm (in stock at CERN) 1) 3.5–mm-wide 14-strand cable was developed for the initial MQXS design M. Karppinen CERN TE-MSC

  11. Single Plane MCXBH/V Design Options Two-layer design, 6 Tm / 4 T: • Conceptual magnetic and mechanical design completed. • Sensitive for the HX-hole location and diameter (saturation effects). • Overall length ˜1.8 m. • Based on 18-strand cable successfully produced at CERN. • Over-designed for the updated strength requirements. For 2.5 Tm could run at reduced current and/or shorten to ˜1.5 m • Not enough SC strand stock (275 km) for the total no. of magnets (with 8 MQSX). Single-layer design 1.5..2.5 Tm / 2.3 T: • Engineering design completed. • Less sensitive for the HX-hole dimensioning (as long as in 45 degrees…). • Overall length ˜1.1..1.4 m • Better adapted for stay-clear collars. • Better adapted for the new “spec”. • Existing SC strand stock (275 km) would be sufficient for 45 MCXB coils and 9 MQSX magnets. M. Karppinen CERN TE-MSC

  12. MCXB Single-Layer Design Ø570 Ø140 M. Karppinen CERN TE-MSC

  13. MCXB 3D harmonics (2 x return end) Coil length = 0.9 m Total length = ˜1.1 m b3= 0.74 units b5= 2.86 units b7= -0.41 units b9= -1.65 units b11= -0.55 units ˜260 mm B1= 0.34 Tm x 2 + 2.3T x 0.36 m = 1.5 Tm ENDS STRAIGHT M. Karppinen CERN TE-MSC

  14. MCXB 4-Block Design Quench (3kA) Rd = 0.16 Ω Warm diode No heaters Tmax < 90 K M. Karppinen CERN TE-MSC

  15. MCXB 150 mm Mechanical Model All components for the model magnet in stock M. Karppinen CERN TE-MSC

  16. Combined H/V-Dipole Development Plan Single plane model magnet #1 Single layer coils Porous polyimide insulationStatus: winding trials done Single plane model magnet #2 Same coil design Resin impregnated coils Braided S2-glass insulationStatus: insulated cable characterization started Combined H/V magnet #3 Nested H/V-dipole Potted or porous coils? Status: Mechanical Concept & FEA in started. Today we do not have a design concept for nested MCXB meeting the requirements for IR. M. Karppinen CERN TE-MSC

  17. Nested MCXB Conceptual Design Magnetic optimization of the nested design has been done for a few possible configurations The analysis of possiblemechanical concepts based on nested collaring initiated • Torque:90’000 Nm/m • Shear stress at coil interface ~2.5 MPa. M. Karppinen CERN TE-MSC

  18. MQXS Skew Quadrupole 2-Layer Design *) 14-strand cable M. Karppinen CERN TE-MSC

  19. MQSX Single-Layer Design M. Karppinen CERN TE-MSC

  20. MQSX 3D harmonics (2 x return end) Coil length = 0.78 m Total length = ~0.9 m A2= 2.36 Tm/mx 2 + 28.3 T/m x 0.54 m = 20 Tm/m ENDS STRAIGHT a6= -0.39 units a10= 0.01 units a14= 1.35 units ˜120 mm M. Karppinen CERN TE-MSC

  21. MQSX Single Layer Design Quench (3kA) Rd = 0.16 Ω Warm diode No heaters Tmax < 50 K M. Karppinen CERN TE-MSC

  22. Higher Order Corrector Development • In the framework of the SLHC Collaboration, CIEMAT has developed, constructed and tested two superconducting corrector magnets: the MCXS sextupole and MCXO octupole. • The design is made in view of the very high radiation dose. • Superferricdesign is sufficient to produce the required field strength • The superconducting coils are placed further out and, to some extent, shielded by the iron poles. • The simple race-track coils are easy to make and the field quality is defined by the precision of the iron poles. • P. Abramian, F. de Aragón, J. Calero, J. De la Gama, L. García-Tabarés, J. L. Gutiérrez, T. Martínez, E. Rodríguez, L. Sánchez, F. Toral, C. Vázquez M. Karppinen CERN TE-MSC

  23. Magnetic design: MCXS M. Karppinen CERN TE-MSC

  24. Magnetic design: MCXO/MCXSO M. Karppinen CERN TE-MSC

  25. MCXS Sextupole Engineering Design • Wet impregnated race-track coils • Standard Araldite resin • Laminated ARMCO iron yoke • Alignment by stainless steel keys • Radiation resistance:Coils located further out and partially shielded by the iron poles. M. Karppinen CERN TE-MSC

  26. MCXS Sextupole Fabrication M. Karppinen CERN TE-MSC

  27. MCXO Octupole Engineering Design • Vacuum impregnated race-track coils • Laminated ARMCO iron yoke • Alignment by stainless steelkeys • Radiation resistance: • Polyimide insulated NbTi wire • CTD 422B: a blend of cyanate ester and epoxy resin • Stainless steel coil spacers • Duratron 2300 PEI connection plate and ancillary pieces • Insulating sleeves made of polyurethane and glass fiber M. Karppinen CERN TE-MSC

  28. MCXO Octupolefabrication M. Karppinen CERN TE-MSC

  29. Test results: Sextupole Warm magnetic measurements at CELLS (Barcelona) Cold training test (CIEMAT) • Training test was done in a vertical cryostat at 4.2 K. • The first quench was at 189 A, a working point about 76% on the load line, reaching 89% at quench number 5, where we ran out of helium, without any detraining. M. Karppinen CERN TE-MSC

  30. Test Results: Octupole • Training test was done in a vertical cryostat at 4.2 K. • The first quench was relatively low, at 48% on the load line, although well above the nominal current. • Afterwards, quench current was increasing slowly, with some slight detraining, till currents around 200 A, where coil 8 was repetitively triggering quench. • After thermal cycle the first quench happened at high current, but second quench showed a significant detraining. • Most of the quenches triggered by coil 7, were followed by a quench in coil 8. Afterwards, it was checked that some screws of the common support wedge were loose. Cold training test (CIEMAT) M. Karppinen CERN TE-MSC

  31. Summary • Engineering design of the single plane orbit correctors (MCXB) and skew quarupole (MQXS) have been completed meeting the requirements of the Phase I upgrade. • Components in stock for single-layer MCXB model magnets based on porous and vacuum impregnated coils. • MQXS and MCXB trial coils have been successfully made with polyimide insulation. • 150-mm-long MCXB instrumented mechanical model was successfully assembled. • Nested MCXB conceptual design work was initiated, but halted since 3 years. Today we do not have design of a nested MCXB magnet meeting the requirements of the HiLUMI upgrade. • SuperferricMCXS sextupole and more radiation resistant superferricMCXOoctupole have been succesfully constructed and tested at CIEMAT. • Magnetic design of Cos-6Θ dodecapoleMCXT was made. M. Karppinen CERN TE-MSC