1 / 17

Status of Chamber Construction QC at CIEMAT

Status of Chamber Construction QC at CIEMAT. B. de la Cruz CIEMAT (Madrid) CMS Week February 2003. Number of SL and Chambers produced up to now: 54  SL 28  SL 24 assembled chambers, 19 already sent to CERN.

dextra
Download Presentation

Status of Chamber Construction QC at CIEMAT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week February 2003

  2. Number of SL and Chambers produced up to now: • 54  SL • 28  SL • 24 assembled chambers, 19 already sent to CERN. Next week, shipment of 5 more chambers. Summary showing continuous trend in construction items: • Wire positions and tensions • Corner Block positions • Chamber thickness & planarity Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)

  3. Wires Position & Tension  SL at table 1 Layer 1Layer 2 Layer 3 Layer 4 Mean=6.4m  = 46.0 m Mean=0.4mMean=-0.4 = 46.0 m  = 38.2 m Mean=2.93 N  = 0.10 N Muons DT QC Meeting - February 2003 CMS Week

  4. Wires Position & Tension  SL at table 1 Layer 1Layer 2 Layer 3 Layer 4 Muons DT QC Meeting - February 2003 CMS Week

  5. Wires Position & Tension  SL at table 2 Layer 1Layer 2 Layer 3 Layer 4 Mean = 4.6 m  = 36.4 m Mean = -5.5 m  = 45.3 m Mean = 3.09 N  = 0.12 N Muons DT QC Meeting - February 2003 CMS Week

  6. Wires Position & Tension  SL at table 2 Layer 1Layer 2 Layer 3 Layer 4 Muons DT QC Meeting - February 2003 CMS Week

  7. Wires Position & Tension Z SL at table 3 Layer 1Layer 2 Layer 3 Layer 4 Mean = 5.3m  = 44.0 m Mean = -7.4m  = 48.5 m Mean = 3.04 N  = 0.09 N Muons DT QC Meeting - February 2003 CMS Week

  8. Wires Position & Tension Z SL at table 3 Layer 1Layer 2 Layer 3 Layer 4 Muons DT QC Meeting - February 2003 CMS Week

  9. Corner Blocks Positions (1 & 4) Change in positioning/measuring methods    Rather uniform corner block position for the different SL at the different construction tables. Residuals (m) Residuals (m) B. de la Cruz CIEMAT (Madrid) Muons DT QC Meeting - February 2003 CMS Week

  10. Corner Blocks Positions(2 & 3) Residuals (m) Residuals (m) B. de la Cruz CIEMAT (Madrid) Muons DT QC Meeting - February 2003 CMS Week

  11. Chamber Thickness SL thickness measured when assembling chamber. Results on 23 chambers . SL (1, 2,Z) Thickness(mm) Chamber Thickness (mm) Mean value= 53.7 mm Mean value = 288.5 mm Width = 0.3 mm Width = 0.3 mm B. de la Cruz CIEMAT (Madrid) Muons DT QC Meeting - February 2003 CMS Week

  12. Chamber Planarity (m) 2 Planarity 1 Planarity Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)

  13. Chamber Planarity (m) HCPlanarity ZPlanarity Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)

  14. SuperLayer Production Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)

  15. SuperLayer Production Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)

  16. Chamber Production Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)

  17. Public Info Public Information on chamber constructionand tests is available at http://wwwae.ciemat.es/cms/QC.html At the moment we are moving our information on DT construction into the Oracle DT Production Database at CERN, proposed by Pablo, see: http://oraweb03.cern.ch:9000/pls/cms_mb_prod/chambers.main Shortly this will beour unique reference database. Asccii files, if needed, will be automatically produced from it. Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)

More Related