An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Future Work on the TSS(after October 2006) Elements for the Attribution of Haze WG’s 2007 TSS Workplan TSS Project Meeting – March 31, 2006

  2. WRAP Technical Timelines • March through May 2006: • Complete 2018 base case EI (version B) • Goal is to complete modeling of the following (in order): • Base02b – final 2002 actual emissions case – CMAQ/CAMx • Planning02b – final 2000-04 “typical” emissions case • CMAQ/CAMx • CAMx with PSAT • Base18b – final 2018 base case emissions projections (rules/controls on the books) – • CMAQ/CAMx • CAMx with PSAT • Make significant progress on CalPuff “subject-to-BART” modeling for sources in 5 states, and coordinate review and display of similar results from states conducting that modeling on their own • Prepare and complete PMF 2000-04 baseline period receptor modeling analyses • Incorporate these modeling results in Weight-of-Evidence formats • Sulfate and nitrate – format #1 • Carbon – format #2 • Dust – format #3 (will likely NOT include RMC results) • Technical Support documentation/tool development

  3. WRAP Technical Timelines • June through August 2006: • Prepare and complete 2018 control strategy EIs • Revised/improve Oil and Gas projections • Presumptive SOx and NOx limits for EGUs from BART Rule • [Possible] Backstop or Active Point Source Cap & Trade program (based on EGUs, include both SOx & NOx, & have a critical mass of emissions in the WRAP region) • Prospective control strategies from each/all states • Modeling • Complete CMAQ/CAMx modeling for above control cases • Complete CMAQ/CAMx sensitivity modeling for 3 to 4 items at the top of the list in the RMC 2006 Modeling Workplan Outline • Continue to make significant progress on CalPuff “subject-to-BART” and “visibility improvement from BART engineering analyses” modeling for sources in 5 states, and coordinate review and display of similar results from states conducting that modeling on their own • Complete displays and data loads for key data results from the CoHA project: PMF 2000-04 baseline period receptor modeling analyses, back trajectories, other work • Complete display and data loads of 2002/2000-04 baseline period and 2018 base case Weight-of-Evidence results in al AoH formats using Technical Support System • Technical Support documentation/tool development

  4. WRAP Technical Timelines • September through Fall 2006: • Complete data loads & displays of Technical Support documentation for: • 2018 Control Strategy EIs and modeling results • BART modeling results • Identify uncertainty and limitations • Final version of tools and displays in technical system

  5. WRAP Technical Support System –transition to planning • Winter 2006-07 through December 2007 plan deadline: • Additional regional modeling? • Planning process in earnest: • Rulemakings • Public hearings • Development work for AoH Technical Support System and transition support for input systems: • EDMS • CoHA • IMPROVE • Address: • Emissions • Modeling • Monitoring

  6. WRAP TSS 2007 Activities List • TSS maintenance through December 2007 [CIRA - Shawn/Rodger] • Hardware maintenance • Software maintenance • Bug fixing • Technical support for web site • Analytical user support through December 2007 [ARS/IM/ENVIRON] • Support SIP writers in understanding existing analyses on the TSS • Support SIP writers in understanding analytical tools on the TSS • Provide analytical support as required (additional analyses on request?) • TSS enhancements through 12/07 [TSS Project Team] • Enhance integration of emissions and modeling data into TSS [Gerry] • Add/enhance capability for user input and export of monitoring, modeling, emissions, and GIS layer data [Shawn/Jeff] • Add capability to integrate other databases on the TSS [Shawn/Jeff/Gerry] • Build on repository of regional/local analyses [Joe/Tom] • Capability to link TSS to other existing web databases [Jeff] • Fuller implementation of metadata [Jeff]

  7. Other ideas to add on for TSS functionality/efficiencies • Examples: • Repository/support for RMC files and software • Fire Tracking System • Emissions tracking • PSD increment database • Critical loads analysis module • Others? • Could start in 2007, but require funding in addition to AoH WG support of TSS operations/improvements listed previously