Polarimetry: 2006 plans

Polarimetry: 2006 plans. Provide polarization measurements for accelerator Provide polarization measurements for experiments Everything ready (almost) and will work perfectly !. Setup for p C scattering – the RHIC polarimeters. inside RHIC ring @IP12. beam direction.

enid
Download Presentation

Polarimetry: 2006 plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Polarimetry: 2006 plans Provide polarization measurements for accelerator Provide polarization measurements for experiments Everything ready (almost) and will work perfectly ! Alessandro Bravar et al.

  2. Setup for pC scattering – the RHIC polarimeters inside RHIC ring @IP12 beam direction Ultra thin Carbon ribbon Target (3.5mg/cm2, 5mm wide) 6 1 5 2 Si strip detectors (ToF, EC) 3 4 Beam direction 2 ´ 18 cm all Si strips parallel to beam RHIC ´ 2 rings • most modifications to electronic chain implemented • extensive “target” debugging over last summer targets Made in Indiana (narrower, thinner, better …); new holder with 6 targets • vacuum: should have addressed most issues • DAQ for Blue, Yellow, and JET fully decoupled • installation: will start next Tuesday • bring to full operation: 2 – 3 weeks from now POLARIMETRY

  3. Manpower issues • brought up several times in the past: so far no progress ! • 2005 analysis will stop cannot prepare for 2006 run (software development) and analyze “old” data • need two persons for Q&A during the run POLARIMETRY

  4. 2006 polarization data • ONLINE -> CDEV: based on scaler mode (as in previous years) • Reanalyze each measurement in event mode in real time: • Q&A • Calibrations • Systematic studies For this need two persons taking polarimetry “shifts” Update in CDEV or by different means ? AIM: “preliminary” polarization soon after the end of the run • Target scans • relay on target hardware rather than software target “controls” • currently being developed • Want more? Time to ask now ! Will try to make everybody happy POLARIMETRY