Hydro Milling Group, Inc. Worldwide Service Specialists In: Refinery Pipeline Cleaning Power Plant Pre-Commissioning www.ZeroPing.US.com ToddRidgeway@hotmail.com. HMG Benefits Your Company!. Reduction of steam blow duration by 70%. Increased flow rate. Reduced operating pressure.
E N D
Hydro Milling Group, Inc. Worldwide Service Specialists In: Refinery Pipeline Cleaning Power Plant Pre-Commissioning www.ZeroPing.US.com ToddRidgeway@hotmail.com
HMG Benefits Your Company! • Reduction of steam blow duration by 70%. • Increased flow rate. • Reduced operating pressure. • Reduced down time for maintenance. • “Zero Ping”: HMG is the only company in North America who has ever accomplished a zero ping. • Debris-free pipeline ready for steam and air blows. • Ultra responsive team ready to serve you. • Competitive Pricing
Hot Reheat Cold Reheat Condensate Lines LP Steam HP Steam Main Steam Underground Fuel Gas Lines Condensers Slug Catchers ACC Ductwork Closed Cooling Systems Applications Include:
Extensive Project Experience CURRENT ONGOING JOBS B & W Fluid Dynamics Inc 9/1/2010 Shell Pearl GTL Project - Doha, Qatar 6/29/2010 Harry Allen Project- Las Vegas. NV 5/26/2010 Total Project - Port Arthur - TX 5/13/2010 Shell Pearl GTL BWFD Laydown Area - Ras laffan, Qatar Fluor Enterprises, Inc. 11/1/2010 Jack County Project - Jack Cnty TX Hyundai Heavy Industries Co, LTD 11/20/2010 Pearl GTL Project - FGP Works, Ras Laffan Industrial City, Qatar
Extensive Project Experience COMPLETED JOBS Annabeeb Services Co, LTD 11/4/2008 Dolphin Project - Doha, Qatar B & W Fluid Dynamics Inc 5/21/2009 KCP&L, KS - Iatan II Project 6/30/2010 Fremont Energy Center - OH 7/27/2010 Shell Pearl GTL Limited - Job # 2010051083 Richard Brain Associates 1/28/2008 Calumet Facility -Sheverport, La. LA Best Energy Services & Technology Cooper River Project, Wando 2/21/2005 Hermosillo Project - Abener Mexico 1/2/2002 Mystic Station Job # 1 4/8/2002 Mystic Station Job # 2 Black & Veatch Construction, Inc. SMUD - Sacramento, CA 5/7/2002 Wisconsin Public Service Corp - Western 4 - Green bay, WI Boston Power Group 12/10/2001 Mystic Station - Bellingham Site, MA Houston-Texas Petro Chemicals L.P. BP Amoco 2/24/2006 Cooper Ricer Project – NH Burns McDonnell Engineering 7/12/2006 Petro Chemical - Houston, TX Calpine 2/2/2001 Delta Energy Project - Pittsburgh, CA CTJV 11/24/2007 Ras Gas Project- Doha 5/7/2008 Compander Unit/Dried Natural Gas Piping - Doha, Qatar 11/4/2008 Dolphin Project (Slug Catcher "A" Unit) - Anabeeb, Qatar Dick Corp. 3/2/2002 AES Granite Ridge Power Project - Londonderry, NH
Extensive Project Experience COMPLETED JOBS Duke Fluor Daniels 7/7/2001 LTV Indiana Harbor Works Energy Facility - E. Chicago, IN Fluor Enterprises, Inc. SCE&G SO2 Compliance Project 7/12/2010 Wateree Project, Wateree SC GE International 9/12/2000 Westbrook Power project - Westbrook, Maine Gulf Strategic Partners 7/31/2007 BFW Project-Manama, Kingdom of Bahrain Hermosillo Project Kiewit Industrial Company 6/25/2003 L.A. Power Project - Sun Valley, CA 7/11/2005 Palomer Energy Project - Escondido, CA KLS Services-Los Alamos, NM Los Alamos National Lab Madison Gas & Electric Compnay - Madison, WI 11/21/2005 WCC Co-Gen Project Marcus Hook LP Contract # 12102-EH-42E Job 1 Job 2 Job 3 Master-Lee Industrial Services Doswell Limited Partnership MGE Construct LLC West Campus CoGen - Contract# P1468 Pfizer Global Manufacturing, Inc. 6/15/2001 Groton Plant Job # 1 - GPT/0187/0017 - Groton, CT 4/8/2002 Groton Plant Job # 2 - GPT/07TA/0099 - Groton, CT Pfizer Gas Turbine Project 1/6/2010 Pfizer Cool Water Piping Scheck Mechanical 7/25/2003 Covert Generating Station - Covert, MI Shaw Stone & Webster 2/24/2006 Astoria Energy Project 1 - Astoris, NY 11/10/2003 Sun Oil Refinery - Marcus Hook, PA 7/25/2003 Covert Generating Station - Covert, MI
Provide reduction of steam or air blow duration by as much as 70%. Saves down time, reduces maintenance costs, and increases revenues. Multiple zero pings have been achieved “Zero Ping” Target Typical target Results: Why HMG’s “Zero Ping” Test Benefits You:
Process Overview • Hydro Milling Group offers the latest in high-pressure hydro lazing for removal of mill scale, calcium/mineral deposit, paraffin buildup, and many other types of debris. • Our process utilizes a 510 HP continuous duty Duetz engine and K-35000 Kamat high-pressure pump which is mated with the HMG “Hurricane” system. This cleaning process is state of the art and provides superior pipeline cleaning ability. • A rotational feeder controls the nozzle tracking and cleaning path.
Process Overview • As the nozzle is rotated around the inner diameter of the pipe, all mill-scale , weld slag and debris is removed from the inner surface of the pipe. All debris is flushed behind the cleaning nozzle. • The thrust jet ensures the cleaning jets are held closely to the interior pipe wall.
Equipment • All Hydro Milling Rigs arrive on site equipped to handle every anticipated need.
Mobile Control Room/office • Hydro Milling Group rigs arrive onsite complete with a mobile control room/office.
High-pressure Pump • The Kamat high-pressure plunger pump produces a maximum pressure of 21,750 psi with a maximum flow rate of 65 gpm. • Powered by a 510 hp continuous duty Duetz engine. • Enclosed within an industrial, sound insulated steel container. • Remote-controlled emergency shut-down in one-tenth of a second. Accidental damage to control cable immediately shuts down entire system.
Emergency Control • The remote control emergency button allows the operator to remotely shut the entire system down in one-tenth of a second.
Hurricane Rotating System Is Capable Of: • Providing highest grade of steam pipe cleanliness. • Cleaning piping diameter from 3 inch (76.2 mm) to 21 ft. (5m). • 1500 ft. (457 m) continuous in length performed. • Vertical runs up to 350 ft. (107 m) • Cleans horizontal, vertical, u-bend, and submerged piping. • Capable of multiple changes of direction. • Pump distance to work area up to 600 ft (183 m). • No damage to pipe material.
Feeder • The feeder controls the forward and reverse function of the rotating nozzle while maintaining the predetermined rate of rotation.
Nozzles • Specialty nozzles are selected for each application to meet our customers’ needs. • Multi-orifice nozzles are rotated around the inside diameter of the pipe providing precise, thorough cleanliness. • Our specialty nozzles are designed and built in-house.
Quality of Work • Sampling of mill-scale found in steam pipe prior to the hydro-milling cleaning process.
Quality of Work • After HMG’s high quality, high pressure cleaning system is utilized, the pipe is clean and ready for steam or air blows.
Safety and Quality • Extensive project experience with no accidents. • Comprehensive technical training for operators, technicians and supervisory staff. • Proper planning and communication prior to job commencement. • Specialized safety and training for employees. • Daily safety meetings are mandatory. • HMG has maintained a “ZERO” rating on our OSHA 300 Log since the inception of our firm.
Hydro-Milling Group, Inc.Have we earned your business?Next Steps? Offices in United States and Doha, Qatar www.ZeroPing.US.com Direct email contact: ToddRidgeway@hotmail.com