Supercycle proposal for 2014+

Lau Gatignon, TDAQ meeting, 18 December 2013. Supercycle proposal for 2014+. Introduction. CNGS has been completed.

frayne
Download Presentation

Supercycle proposal for 2014+

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lau Gatignon, TDAQ meeting, 18 December 2013 Supercycle proposal for 2014+

  2. Introduction • CNGS has been completed. • CNGS required to add many 6 seconds cycles to the supercycle, thus increasing the overall length. Without change of flat top the duty cycle would thus decrease from 33 to about 10%. • As the CNGS cycles consume very little RMS power, it was decided that we would double the flat top from 4.8 to 9.6 seconds, to reach a duty cycle of 21%. • Now that CNGS is completed it is of general interest to find back the highest duty cycle.

  3. The proposal • Go back to a 4.8 seconds flat topWith the same instantaneous intensity this needs fewer protons in the machine per cycle. Hence smaller losses (non-linear). This also avoids a conflict in proton sharing with COMPASS. (Also faster for setting up the beam). • Combine two flat tops in a longer super-cycleThis leaves more freedom for the other users of the PS complex • Still respect the RMS power limit in the SPSThis imposes a minimum time between two flat tops • Note that LHC filling is not required in 2014, but maybe MD’sBut the proposed scheme should be the same for 2014 and 2015+

  4. The proposal in detail

  5. Implications for NA62 (and NA) 14.4 s 6 s I.e. less time between cycle 1 and 2 than between cycle 2 and next cycle 1. Each cycle comes with the usual timing events (WWE, WE, EE)There is no event distributed for the super-cycle For the cycle without LHC filling the time between flat tops in 9.6 seconds