An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pueblo of Isleta Island Removal Project Kyle Shour, E.I. – Tetra TechMay 6, 2014

  2. Water Trust Board Grant Agreement Scope and Objectives: • Removal of islands below the Isleta Diversion Dam • Restore this reach of the Rio Grande to the Traditional view of the Pueblo • Restore the connection between the shallow ground water aquifer and the river • Create habitat for the RGSM • 2 backwater features constructed • Being done upstream of the Isleta Diversion Dam

  3. Design Objectives • Maintain year-round wet channel along west bank • Integrate with restoration work at cultural site on west bank • Assess geomorphology • Model three flow events • Low flows to maintain flow against west bank • Mid-level flow to determine sediment transport • High-level flows to determine hydraulic design parameters • Endangered species habitat features • Remove invasive vegetation

  4. 2002

  5. 2005

  6. 2008

  7. 2012

  8. DesignPlan ViewCross-sectional View

  9. Modeling Tools • 1D vs 2D modeling • SRH-2D v. 30 • Public domain, hydraulics and sediment transport modeling available through USBR • Solves depth-averaged, 2D St. Venant equations • Calculates sediment transport capacity at each cell for each timestep using Engelund-Hansen equation, compares to supply • SMS v. 11.0 • Create hybrid mesh • Visualize & post-process model output

  10. Fixed-bed, Mobile-bed Modeling: Fixed-bed Model Mobile-bed Model • Comparison of existing and design hydraulic parameters • Results used to: • Size rip rap • Calculate scour • Comparison of existing and design bed elevation change, sediment concentration • Results used to evaluate sustainability

  11. Inundation Mapping: 100 cfs 1,200 cfs 3,000 cfs

  12. VelocityMapping 100 cfs 1,200 cfs

  13. Bed Elevation Change

  14. Project Uncertainties • Project is within a sediment laden and dynamic river system • Project life span subject to many elements beyond the control of either party • long term spring runoff events • short term thunderstorm events in upstream tributary arroyos • operations of the Isleta Diversion Dam

  15. Construction • Performed by AJAC Enterprises, Inc. • Removed ~70,000 cubic yards of material • NTP to substantial completion: 84 calendar days

  16. Completed Project

  17. Post-Construction Maintenance: • Removal of woody vegetation on benches on an annual basis • Removal of deposited sediment in channel on an as-needed basis depending on flows • Destabilize any emergent islands

  18. Questions? Thank You