180 likes | 306 Views
Pilot sites - progress. 5th PP meeting Lakatamia, 10-15 June 2014. Veronika Valentar. ENERGY EFFICIENCY BUILDINGS ENERGY SAVING WOOD BIOMASS SOLAR ENERGY BIOGASS WATER ENERGY FEASIBILITY STUDIES FINANCING PUBLIC LIGHTNING BIOCLIMATIC AREAS WATER PUMPING. WHAT ARE WE DOING?.
E N D
Pilot sites- progress 5th PP meeting Lakatamia, 10-15 June 2014 Veronika Valentar
ENERGY EFFICIENCY BUILDINGS • ENERGY SAVING • WOOD BIOMASS • SOLAR ENERGY • BIOGASS • WATER ENERGY • FEASIBILITY STUDIES • FINANCING • PUBLIC LIGHTNING • BIOCLIMATIC AREAS • WATER PUMPING WHAT ARE WE DOING? MARIBOR KOPRIVNICA-KRIŽEVCI VERDON, MEAILLES LA SPEZIA SARAJEVO MANZA PODGORICA ALENTEJO GRANOLLERS LAKATAMIA RHETYMNO INNOVATIVE APPROACH, CONCRETE RESULTS, FUTURE INVESTMENTS!
PILOTS 1-2- MARIBOR MARIBOR 1: Biomassheatingboilersforpublicbuildings: 2 municipalities ( 1 new, 1 optimised) Themainobstacle: european, national, localelections, no funding MARIBOR 2: Energyefficiency in culturalheritagebuilding: Energyidentitycard in progress Developmentofscenariosnot in progresyet Themainobstacle: communicationbetweenstakeholders
PILOT 3- MANZA ALBANIA Problem: Wastemanagement, waterscarcity, pollution Focus: younggenerations Actions: Trainingcourses: Howmanytrainingcourses? Anytrainingmaterialsdeveloped? Center forenvironmentalandGreenEnergy?
PILOTS 4-5: SARAJEVO BOSNIA AND HERCEGOVINA SARAJEVO 1: CO2 emmisions Actions: Questionnaires Result: Feasibilitystudy Q1: howuseful are projectmaterials: e.g. funding, awarenessetc. SARAJEVO 2: Eco schools Actions: awareness Q2: anymaterials in yournationallanguage?
PILOT 6- LAKATAMIA LAKATAMIA: Action: Investment to thebiomassboiler Feasibilitystudyaboutbiomasssupply Obstacle: modificationoftheproject; Q1: biomasssupply?
PILOTS 7-8- FRANCE PARC NATURAL REGIONAL DU VERDON Action: Territorial biogas project Q1: Is this project realizable in the period 2014- 2020? 2. HYDROPOWER PLANT ON AN IRRIGATION CHANEL Q2: How far are you?
PILOTS 9-11- GREECE FEASIBILITY STUDIES PUBLIC LIGHTNING WATER TREATEMENT AND PUMPING BIOCLIMATIC DESIGN OF OPEN SPACE Q1: Haveyoualreadyselected, suimulatedanddesignedtargetplaces in oldtownofRhetymno? Whichcriteriadidyouusebyselectionoftarget?
PILOTS 12-15 CROATIA FEASIBILITY STUDIES Possibilities for biogas and biomass producers: technical solutions and investment proposals Q1: Fundingpossibilitiessince CRO is a memberof EU? 2. Photovoltaicpanels at thepublicbuilding Q2: Developmentof a GIS model fordataanalysisandmonitoring RES andenergyefficiency? 3. Energyefficiency in publicschoolbuilding- technicalsolutionandinvestmentproposal
PILOTS 16-19- ITALY Thelargestnetworkofdecisionmakers Strengtheeninglocalpublic –privatepartnershipssupportingenergyefficiency 2. Raisingawarenessandimplementingenergyefficiencyupgrading in schools 3. Mobilisationfundsforinvestment in sustainableenergy at locallevel 4. Trainingcivilsocietyorganizations in energycertification Q1: Nr. Ofconcretelocations (feasibilitystudies, energyaudits, emissioninventories) involved? Q2: Environmentalandenergy centre? Q3: Web platform toolfortrainingcourse?
PILOT 20-MONTE NEGRO Feasibilitystudiesabouttheuseofhydropower Case: Jezerstica Q1: Nr. Ofevents? Anynewobstaclesidentified?
PILOTS 21-23 CATALONIA Starting up of a “Championship for energy saving” in public buildings Installation of remote control systems for energy management in public buildings participating in “championship” Technical and economic feasibility study on the installation of trigeneration in the form of selfconsumption and provision of energy services to Granollers Q1: doesremotecontrollenablefeedback on
PILOTS 24-29 PORTUGAL Personalisedtrainingsfor SME-s Publiclightningenergyefficiency Networkforelectricityefficiency LEDsfortrafficlights Zeroemmisionscommunities Q:The progressofwork, investments?
POSTERS 1st slide - Title of the Pilot case, which technical-non technical thematic area - LAG related to the specific pilot case (members) - Photo representative to the pilot project/area In addition, we propose a graphic sign for the country flag+partner’s logo - Start-End date of pilot case implementation 2nd slide Starting point – which was the identified need - reasons for change that led to the specific pilot action Solution proposed Cooperation established? Targets set (i.e. energy savings, people reached, investments challenged, new jobs etc) Key actions taken so far (i.e. to solve the problem “technically”, soft measures to raise awareness/improve habits, capacity building) 3rd slide Main barriers identified during the implementation of the project Benefits for the community Lessons learnt 4th slide which are the next steps by the end of the project so that you will achieve the aim of the pilot case as described in the Application Form (e.g. investment realized, investment proposal prepared, technical solution prepared etc.)
2nd slide - Starting point – which was the identified need - reasons for change that led to the specific pilot action - Solution proposed - Cooperation established? - Targets set (i.e. energy savings, people reached, investments challenged, new jobs etc) - Key actions taken so far (i.e. to solve the problem “technically”, soft measures to raise awareness/improve habits, capacity
3rd slide - Main barriers identified during the implementation of the project - Benefits for the community - Lessons learnt
4th slide which are the next steps by the end of the project so that you will achieve the aim of the pilot case as described in the Application Form (e.g. investment realized, investment proposal prepared, technical solution prepared etc.)
Ifyoucan‘t explainsimply, you don‘t understand it wellenough! (Albert Einstein)