1 / 13

EEGS IRKP2 Meeting

EGNOS Extension to Eastern Europe. EEGS IRKP2 Meeting. ROSA activities in EEGS Date 24.06.2010 Place Warsaw. CONTENTS. Status of ROSA activities in EEGS: WP2: EGNOS Improvement in Eastern Europe WP3: Regional Feasibility and Integration Studies WP4: Demonstration Activities.

lazar
Download Presentation

EEGS IRKP2 Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EGNOS Extension to Eastern Europe EEGS IRKP2 Meeting ROSA activities in EEGS Date 24.06.2010 Place Warsaw

  2. CONTENTS • Status of ROSA activities in EEGS: • WP2: EGNOS Improvement in Eastern Europe • WP3: Regional Feasibility and Integration Studies • WP4: Demonstration Activities EEGS-IRKP2 Meeting

  3. WP2: EGNOS improvement in Eastern Europe Activities: • WP2.3 Infrastructure improvements • ROSA providedone week of RINEX data (1Hz GPS L1/L2) for Romanian reference station(s) (BUCU and BUC1) EEGS-IRKP2 Meeting

  4. WP3: REGIONAL FEASIBILITY AND INTEGRATION STUDIES Activities: • WP3.1GNSS context, RIMS and Service Provision • Task 2:ROSA will compile the information requested in a document template according to the guidelines and will fill the document for the Romanian case: EEGS-ROSA_ROMS_D8 document • The document has two parts: • RIMS data collection sheet • GNSS Market Development information EEGS-IRKP2 Meeting 29/08/2014 Page 4

  5. WP3: REGIONAL FEASIBILITY AND INTEGRATION STUDIES Activities: • WP3.1GNSS context, RIMS and Service Provision • RIMS data collection sheet EEGS-IRKP2 Meeting 29/08/2014 Page 5

  6. WP3: REGIONAL FEASIBILITY AND INTEGRATION STUDIES Activities: • WP3.1GNSS context, RIMS and Service Provision • RIMS data collection sheet –RIMS location in Bucharest Faculty of Land Reclamation and Environmental Engineering EEGS-IRKP2 Meeting 29/08/2014 Page 6

  7. WP3: REGIONAL FEASIBILITY AND INTEGRATION STUDIES Activities: • WP3.1GNSS context, RIMS and Service Provision • GNSS Market Development information • Air Traffic Service providers interested in GNSS (market analysis and sizing) • Maritime /Road providers interested in GNSS (market analysis and sizing) • R&D Companies in GNSS market (market analysis and sizing) • General companies interested in GNSS applications (SBAS data exploitation, market analysis and sizing,...) EEGS-IRKP2 Meeting 29/08/2014 Page 7

  8. WP4: Demonstration Activities Activities: • WP 4.1 Definition and Procurement • Task 4: ROSA will prepare the demonstrations in Romania with all the necessary preparatory activities which will include as a minimum and as required by the associated demonstrations • WP 4.2 EGNOS Extension Demonstrations • Task 2: ROSA will manage a demonstration in Romania. This demonstration will show how EGNOS coverage area could cover Romania with an enhanced EGNOS with algorithm modifications and additional RIMS in Romania (the number of RIMS will be an input from the WP 2.3 analyses). • WP 4.4 Demonstrations Results Analyses • Task 2: ROSA will analyze the results of the demonstrations in Romania at user level. EEGS-IRKP2 Meeting 29/08/2014 Page 8

  9. WP4: Demonstration Activities Activities: • WP 4.1 Definition and Procurement • ROSA will compile the information requested in a document template according to the guidelines and will fill the document for the Romanian demonstrations: EEGS-ROSA_ROMD_D16 document • Dynamic demonstration • Static demonstration • Waterway demonstration • Objective- comparison between GPS-only signal, signal with magicSBAS and signal with ROMPOS (Romanian Position determination System) DGNSS service EEGS-IRKP2 Meeting 29/08/2014 Page 9

  10. WP4: Demonstration Activities Activities: • WP 4.1 Definition and Procurement • Dynamic demonstration EEGS-IRKP2 Meeting 29/08/2014 Page 10

  11. WP4: Demonstration Activities Activities: • WP 4.1 Definition and Procurement • Waterway Demonstration EEGS-IRKP2 Meeting 29/08/2014 Page 11

  12. WP4: Demonstration Activities Activities: • WP 4.1 Definition and Procurement • Waterway Demonstration EEGS-IRKP2 Meeting 29/08/2014 Page 12

  13. Thank you

More Related