PIP Update

PIP Update. April 3 rd 2013. Agenda. Summary Update Current Activities/Updates Startup Plans Upcoming Talks, Reports, Meetings Updates/Talks : Trevor Butler - Linac Modulator Prototyping Yuri Alexahin - Plans for Booster Studies (transition crossing, synchro-betatron coupling).

morag
Download Presentation

PIP Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update April 3rd 2013

  2. Agenda • Summary Update • Current Activities/Updates • Startup Plans • Upcoming Talks, Reports, Meetings Updates/Talks: • Trevor Butler - Linac Modulator Prototyping • Yuri Alexahin - Plans for Booster Studies (transition crossing, synchro-betatron coupling)

  3. Update General Info • Booster Beam: Running at reduced levels – need more RF! • Studies are underway: • Apertures / Orbit Smoothing will continue – more magnet moves in future (Kiyomi) • Optics correction for the next two weeks (Megan,Eliana,Yuri,Tan,Marsh,Kent) • Booster SS: Stations are operating – controls / shunt problems • PIP accounts should no longer be used (Ann – working on closing out accounts) • Booster RF cavity rework – RF1 work nearly done – testing? • Cavity from RF15 – shipped last week – Front and back tuners off (LCW leak repair, OK) • Spare cavity work – making progress: sanded for better fit, parts in machine shop • Booster RF Cavity 7 (8 also but less) has an RF leak and will likely be removed for repair • Will swap with RF 1 when ready – looks like next week soometime • We will have 17/19 cavities after the next swap (up from 16) – may allow high-intensity • Booster Ferrites • Low Frequency tester – modified: machined for less snug fit, ready for shipping – should test first, Second tester parts are about ready to be assembled… • mu=20 cores have been ordered, Reid has not yet found a old mu=20 core for vendors to use. • RFQ – still waiting on trim / 2ndsource: Trim core will arrive in 3 weeks, then be wound • HLRF – planning site visit at vendor • Linac Modulator –talk • Booster Shielding – Scans have been written up, will be revised and transmitted to ES&H • Booster Transverse damper needs to be re-commissioned, Long damper plans started • MI Startup: New date is 3rd week of June – funding questions still remain… Startup comments (Fernanda, Todd, Mary)

  4. Upcoming Talks Future Meetings: Today: • Trevor Butler - Linac Modulator Prototyping • Yuri Alexahin - Plans for Booster Studies (transition crossing, synchro-betatron coupling) To be Scheduled: • Dave Augustine - Vacuum Installations Finished and in Planning • Jean-Paul Carneiro - TraceWin 3D Simulations of the Fermilab Linac • Bill Pellico - Loss Test Scans for Shielding Assessment • John Reid - Solid State Installation - Final Report

  5. Upcoming • Reports • Update of PIP Design Report – Yearly update work • PMG & Quarterly report in April (Date not set yet) • March status update – reports are starting to came back • Budget Issues – No change from last week - • Have not heard of any new impacts from lab budget • Still struggling with Additional Overhead Cost – no resolution yet • Working to address cost of spares - Please use the E-Log to put general work in progress updates/photos – weekly would be nice – if progress is being made in task